PowerHouse Energy Group — Fuelling the hydrogen economy

PowerHouse Energy Group — Fuelling the hydrogen economy

Over the last 18 months PowerHouse and its partners Peel Environmental and Waste2Tricity (W2T) have put most of the building blocks in place for commissioning the first commercial distributed modular generation (DMG) waste-to-energy plant by the end of FY20. This potentially represents the first of dozens of small sites in the UK and abroad using unrecyclable plastic that would otherwise go to landfill to generate hydrogen for electric vehicles and electricity.

Analyst avatar placeholder

Written by

PowerHouse Energy Group

Fuelling the hydrogen economy

Alternative energy

Spotlight research

12 September 2019

Price

0.41p

Market cap

£8m

Share price graph

Share details

Code

PHE

Listing

AIM

Shares in issue

1.92bn

Net cash (£m) at end Dec 2018

0.8

Business description

PowerHouse Energy designs, delivers and licenses plastic regeneration processes for the generation of hydrogen and electrical energy. It also provides associated customer engineering and testing services, and operational support for applications in the UK and across the world.

Bull

DMG technology provides mechanism for diverting waste plastic from landfill.

Hydrogen generated from DMG plants may be used for fuel cell vehicles.

Electricity from DMG plants complements intermittent supply from wind and solar sources.

Bear

Commercial-scale unit not constructed yet.

Deployment of DMG units dependent on developer securing funding for developments.

Limited cash reserves.

Analyst

Anne Margaret Crow

+44 (0)20 3077 5700

PowerHouse Energy Group is a research client of Edison Investment Research Limited

Over the last 18 months PowerHouse and its partners Peel Environmental and Waste2Tricity (W2T) have put most of the building blocks in place for commissioning the first commercial distributed modular generation (DMG) waste-to-energy plant by the end of FY20. This potentially represents the first of dozens of small sites in the UK and abroad using unrecyclable plastic that would otherwise go to landfill to generate hydrogen for electric vehicles and electricity.

Expanding pipeline with Peel Environmental

In August 2019, PowerHouse signed a collaboration agreement with Peel Environmental. This seeks to develop 11 DMG facilities at sites in the UK, primarily on Peel’s land, including a project announced previously at Peel’s Protos Energy Park on Merseyside. Investors in these projects are being offered a potential IRR of over 30%. PowerHouse will receive fees for each project for carrying out tests on the proposed feedstock and providing a customised front-end engineering design. Additionally, once each plant is commissioned, PowerHouse will receive operating licence fees. Peel estimates the development costs for this enlarged pipeline of 11 sites would be at least £130m. This business model removes the need for PowerHouse to finance the construction of plants, eliminating a major dilution risk for shareholders, and potentially accelerates roll-out.

First revenue-generating contract

Project developers Peel and W2T have already secured a customer on the Protos estate for the electricity and hot water generated, as well as a primary feedstock and back-up supply. They are now working on securing planning and operating permits for the plant, and financing before they can proceed to the construction and commissioning phase. PowerHouse’s first contract, received in April 2019, was to carry out tests on the feedstock that will be used at this site and provide a front-end engineering design for a DMG unit using the site-specific feedstock.

Valuation: Defined route to profitability

PowerHouse has a qualified pipeline of over 30 sites in the UK where DMG units may be deployed. We calculate that it will reach break-even on sales of two DMGs per year. We estimate that deployment on 10 sites in a year, such as those already identified by Peel Environmental, could generate c £6m operating profit.

Historic financials

Year
end

Revenue
(£m)

EBITDA*
(£m)

PBT*
(£m)

EPS*
(p)

DPS
(p)

P/E
(x)

12/15

0.0

(0.4)

(0.8)

(0.20)

0.0

N/A

12/16

0.0

(0.8)

(1.3)

(0.23)

0.0

N/A

12/17

0.0

(1.6)

(1.7)

(0.17)

0.0

N/A

12/18

0.0

(1.9)

(1.9)

(0.12)

0.0

N/A

Note: *EBITDA, PBT and EPS are normalised, excluding amortisation of acquired intangibles, exceptional items and share-based payments.

Investment summary

Company description: Distributed modular generation

PowerHouse Energy owns an innovative waste-to-hydrogen DMG reactor technology. This technology provides a mechanism to dispose of a wide range of waste streams including unrecyclable plastic by converting them to a carbon-neutral product which may be used to power fuel cell electric vehicles (FCEVs) or to generate electricity. Unlike competitive techniques for converting municipal waste to energy, the reactors do not produce toxic dioxins and furans and have a small footprint. This makes them suitable for deployment at enterprise or community level, producing hydrogen or electricity close to the point of consumption.

Financials: Sufficient funding until end June 2020

Operating losses widened by 38% year-on-year during FY18 to £2.5m, reflecting higher R&D and staff costs and higher share-based payments. Losses before tax (adjusted for share-based payments) rose more slowly, by 16% to £1.9m, following the settlement of a substantial loan from former investor Hillgrove. The company started and finished FY18 with £0.8m cash. Three equity raises, all at 0.5p/share, with total net proceeds of £3.4m were balanced by £1.9m cash consumed in operations and repayment of the £1.4m Hillgrove loan. The notes to the FY18 accounts state that the directors have prepared working capital projections, which show that the cash balance at end FY18 (there is no debt) is sufficient to enable the company to continue operations for the foreseeable future. This conclusion is based on signed agreements from all the directors and certain contractors to waive future remuneration or fees and a letter of support from one of its shareholders, who is also a director of the company, that he intends to make up to £300k available for at least 12 months from the end of June 2019. Since cash consumption depends on how long it takes for Peel and W2T to secure funding for the first DMG deployment and the level of revenues PowerHouse can derive from providing engineering services, there remains a risk, in our opinion, that it will need to raise more finance.

Valuation: Defined route to profitability

The company’s revised business model positions it as a technology provider, receiving licence income when DMG units are deployed, supplemented by fees for providing engineering services and operational support. This provides a platform to establish the company as a sustainable and profitable business. We estimate that the company would reach break-even on only two DMG deployments per year, with fees from engineering contracts, the first of which was received in April, mitigating cash burn until that point is reached.

Sensitivities: Risk will reduce with commercialisation

While the DMG reactor has undergone more than a year of testing, thus reducing technical risk, risk remains regarding operation in a commercial environment. Importantly, while the purity of the hydrogen produced has been confirmed in third-party tests, the gas output has not been fed into a working fuel cell. While there remains risk associated with scaling up from the 1–3tpd demonstration reactor to a 25tpd commercial project, work with DNV GL has reduced this. There is significant uncertainty about PowerHouse’s ability to convert the high level of interest in the technology into revenues and the timing of that, as well as risk associated with scaling up operations to support commercial activities. Demand for hydrogen from PowerHouse’s reactors will be determined by the roll-out of fuel cells for e-transport and stationary energy generation applications. In common with all companies offering waste-to-energy technologies, PowerHouse will be affected by macroeconomic factors and environmental legislation.

Company description: Responsible, economic energy recovery

PowerHouse Energy Group is commercialising an innovative waste-to-hydrogen, distributed modular generation (DMG) reactor technology. This reactor converts hydrocarbon waste streams, including unrecyclable plastic, into syngas or hydrogen. Syngas can be used to generate electricity for export to the grid or for use in an enterprise. Since the technology operates at a higher temperature than conventional gasification techniques and incorporates gas processing and clean-up, it produces no char or oil residue or toxic dioxins and furans. The syngas should therefore be sufficiently clean to power FCEVs and gas engines. Powering a gas engine is a more efficient route than using the syngas or the burning waste to produce steam to power a turbine. Longer term, the conversion of plastic to gas will permit storage of energy in the syngas until it is needed to make up shortfall from renewable generation sources. Importantly, the conversion provides a route for diverting plastic from disposal in landfill. The technology is carbon emission neutral when operating in power generation mode, and carbon emission negative when generating hydrogen.

The small footprint, modular design of the reactor means that, once commercialised, PowerHouse will offer waste-to-energy systems based on one or more reactors, each capable of handling 25 tonnes of waste per day, which is equivalent to the refuse from a small town of 6,000 homes. A 25tpd (tonnes of waste per day) DMG reactor would potentially generate up to 2,000kg of hydrogen each day, sufficient to drive 2,000 FCEVs an average of 57 miles each. Alternatively, it could generate c 1.6MW electricity (equivalent to a medium-sized wind turbine), sufficient to power around 3,000 homes. This means the DMG reactors can be located close to where the waste material is produced and collected, and generate electricity or hydrogen or electricity fuel close to where it is required, thus cutting down on the costs and energy used in transportation.

Although PowerHouse listed in 2011, it is still at a relatively early stage of corporate development, as any significant commercial progress was precluded until DNV GL completed its independent validation of the full-scale design in October 2018. The company’s 1–3tpd demonstration reactor situated near Ellesmere Port in the UK has been in operation for over a year and provided electricity to the local micro-grid. Based on results from these trials, the company has finalised designs for a 25tpd commercial reactor that have been independently verified. It intends to generate revenues from operating licence fees and operational support once DMG plants developed by third parties have been commissioned, as well as less substantial fees for tests on potential feedstock for proposed installations and customisation of the generic design for specific feedstocks. This business model, which was adopted in November 2018, removes the need for PowerHouse to finance the construction of plants, eliminating a major dilution risk for shareholders. It also enables the company to qualify for EIS investment status.

PowerHouse currently has two full-time employees, although this number will increase as the company progresses towards commercialisation. PowerHouse is currently partnering with Peel Environmental and Waste2Tricity (W2T). PowerHouse supplies the technology, while its partners secure sites for the reactors, negotiate planning and operating permits and contracts for sourcing feedstock and supplying electricity or hydrogen, and will either operate the reactors themselves or sell them to third parties once operational. In H119 the partners secured a site for the first DMG operation, which is on Peel Environmental’s £700m Protos energy hub near Ellesmere Port in England, and signed up a customer on the Protos estate for the electricity and hot water generated, as well as a primary feedstock and back-up supply. UK engineering consultancy, Engsolve, which has worked on numerous gasification projects, provides supplementary design support. PowerHouse has pre-qualified five potential contractors to undertake design and execution, enabling it to support projects on multiple sites in parallel.

Technology: Ultra-high temperature gasification

PowerHouse’s DMG technology is an innovative, patentable process that has been developed over the last 20 years. The DMG unit uses a process in which complex organic molecules are broken down into their constituent elements through indirect heat in an oxygen-starved environment. The reactor is based on a thermal conversion chamber, which is an established technology and uses standard components. Installation is simplified and de-risked through the use of prefabricated components, off-the-shelf skids, pre-assembled piping and structures and limited hook-up demands.

Exhibit 1: DMG process

Source: Company

The company’s IP lies in its understanding of the details of the thermal conversion chamber design and the operating parameters. The IP is protected by automating control of the process so that operators do not need access to the details. In addition, PowerHouse has started to protect the IP by filing for the first of a family of patents.

Competitive position of technology

Exhibit 2: Competitive waste disposal technologies

Incineration

Pyrolysis

Standard gasification

Plasma arc gasification

DMG process

Combustion in unrestricted amounts of oxygen to give CO2 and H20

Combustion in absence of oxygen to give syngas

Combustion in limited amounts of oxygen to give syngas

Combustion in limited amounts of oxygen to give syngas

Combustion in limited amounts of oxygen to give syngas

>850C°

300–850°C

>650°C

>5,000°C

>1,000°C

Heat from burning waste raises steam for steam turbine

Syngas impure so burnt to raise steam for steam turbine

Syngas impure so burnt to raise steam for steam turbine

Syngas pure so potentially used to power more efficient gas turbine or fuel cell

Syngas pure so potentially used to power more efficient gas turbine or fuel cell

Non-combustible material forms non-toxic bottom ash

Non-combustible material forms toxic char

Non-combustible material forms non-toxic bottom ash

Non-combustible material forms non-toxic bottom ash

Non-combustible material forms non-toxic residue.

Potential airborne pollutants treated with toxic chemicals. Still risk of emitting furans and dioxins.

Reduced amount of airborne pollutants.
Still risk of emitting furans and dioxins.

Reduced amount of airborne pollutants.
Still risk of emitting furans and dioxins.

No airborne pollutants

Airborne pollutants reduced in process and then further scrubbed.

Typically, 50–300k tonnes of waste processed/year

Typically, 25–150k tonnes/year

Typically, 60–650k tonnes/year

Typically, 20–700k tonne/year,

Potentially <12k tonnes/year. Process designed so two trains can be installed under local authority permit.

Source: Edison Investment Research

PowerHouse’s DMG technology potentially has numerous advantages compared with other waste-to-energy techniques. Crucially, since it operates at a much higher temperature than pyrolysis, standard gasification or incineration processes, it vaporises the waste material, controlling conditions in the chamber to break down the longer chains of hydrocarbon materials. There is no combustion of the waste to create dioxins. As the syngas is not contaminated with tar it can potentially be used to generate hydrogen for use in fuel cells or used in a combined-cycle gas turbine engine. A gas engine gives an electrical conversion efficiency of up to 40% compared with 14–27% for steam boiler and turbine systems associated with incinerators. Greater efficiencies may be achievable if the heat produced is harnessed effectively. A higher electrical efficiency may be realised if the output gas is optimised for hydrogen content and used to power fuel cells.

Importantly, as the DMG process generates electricity from material that would otherwise incur a tipping fee on disposal, this improves the economics of adoption. DMG operators will receive a fee from the third party whose waste they are destroying, effectively subsidising the energy generation and making smaller modular generation based in the community economically viable. Modelling £15.0m capital costs for a single DMG unit, hydrogen prices of £7/kg, electricity prices of £80/MWh and waste disposal fees of £100/tonne, management calculates that the potential IRR for investors in individual projects is over 30%.

Gasification for waste-to-energy projects

Exhibit 3: Gasification equipment

Company

Plasma

Status

Size

Feedstock

Advanced Plasma Power

Yes

Pilot in Swindon, UK. Company placed in administration in December 2018. Issues with technology and securing funds to cover project overspend.

20tpd

Municipal solid waste and commercial/industrial waste

Alter NRG/Westinghouse Plasma

Yes

Commercial operation in China, India and Japan.
Tees Valley project closed 2016

24-150tpd

Municipal solid waste water sludge, hazardous waste

ArcSec Technologies

Yes

Pilot under construction in Alabama

11 acre site

Multiple waste streams

Ankur Scientific Energy Technologies

No

1,000+ systems installed in Cuba, India, Singapore, Thailand and elsewhere. Not EU safety compliant

Small-scale

Biomass

Bioenergy Infrastructure Group

No

Site at Protos operational March 2019
Site at Levenseat, Lanarkshire experiencing delays with commissioning
Hull site on hold following delays to commissioning

21.5MW
288tpd
657tpd

Waste wood
RDF*
RDF

Covanta

No

Demonstration plant operational at its Tulsa, Oklahoma waste-to-energy site

375tpd

Municipal waste

EQTEC

No

Operational projects in Europe and India

20-100tpd

Primarily biomass

Hitachi Metals/Westinghouse Plasma

Yes

25tpd plant operational in Japan.
150tpd plant commissioned in Japan but closed because of problems with waste contracts

25tpd and 150tpd

Municipal waste and dried sewage sludge

InEnTec

Yes

Operational at landfill site in Oregon.

N/A

Municipal waste

NextChem (Maire Tecnimont)

No

Partnership signed with ENI to convert non-recyclable waste into chemical products and fuel

N/A

Industrial waste

PEAT International

Yes

National Cheng Kung University, Taiwan

3-5tpd

Multiple waste streams

Plasco Energy

Yes

Project in Ottawa was cancelled because of lack of government funding. Company placed in administration.

<405tpd

N/A

PowerHouse Energy Group

No

Pilot on Merseyside, UK

C 3tpd

Shredded plastic, tyre crumb

PRM Energy Systems

No

Over 20 systems in commercial operation in the US, Europe, and South-East Asia

20-2,000tpd

Biomass including sewage sludge

Progressive Energy with Peel Environmental

No

Planning application for plant at Protos site submitted. Due to start operation in 2022. Manufacturing syngas

480tpd

Waste wood and RDF

Shell Global Solutions

No

c 100 plants in operation

N/A

Refinery residues

Source: Edison Investment Research. Note: *Refuse derived fuel.

We note that there are dozens of companies globally developing waste-to-energy gasification equipment, some of which use plasma arc technology to achieve the high temperatures required. Exhibit 3, which is not intended to be exhaustive, lists those companies which appear to have operational projects. We note that some projects have failed because of issues securing large volumes of waste and transporting it over a long distance to supply a single large-scale plant. Unlike many companies developing gasification equipment, PowerHouse’s solution is small scale, so it can be located close to a source of waste, circumventing this problem. Its solution is also relatively unusual in using unrecyclable waste plastic such as film, food trays and rigid plastics as a primary feedstock to generate hydrogen. Other gasification companies typically use different feedstocks. For example, the Bioenergy Infrastructure Group’s plant at Protos uses waste wood and Progressive Energy’s proposed plant at Protos will use waste wood and RDF. Other waste-to-energy technologies using waste plastic deploy pyrolysis techniques to convert the waste to liquid fuel. Management notes that DMG offers potentially lower waste sorting and cleaning costs compared with other energy-from-waste processes and is less sensitive to the calorific range of the feedstock.

Macro opportunity driven by green economy

PowerHouse Energy is positioned to take advantage of the increasingly onerous restrictions regarding the disposal of waste, of rising demand globally for energy, especially energy generated close to the point of consumption and energy to balance the variable output from wind and solar power, and the small but rising demand for pure hydrogen to power FCEVs. PowerHouse’s technology provides a way of not only disposing of waste in an environmentally responsible manner but also extracting financial value from it.

Addressing the issue of plastic waste

According to the PlasticsEurope Market Research Group, the amount of post-consumer plastic waste collected in Europe rose from 24.5m tonnes in 2006 to 27.1m tonnes in 2016, a CAGR of 1.0%. In 2016, 42% was used to generate energy (4.9% CAGR), 31% was recycled (6.0% CAGR) and the remaining 27% (-5.4% CAGR) sent to landfill, with recycling overtaking landfill for the first time. Of the 8.4m tonnes recycled, 63% was processed in Europe, with the remainder exported for treatment. The proportion of plastic waste recycled varies according to the regulatory environment. In Germany, where the regulatory environment virtually prohibits landfill, 38.6% of the 5.1m tonnes of plastic waste collected was recycled, 60.6% converted to energy and only 0.8% consigned to landfill. For the UK’s 3.8m tonnes of plastic waste collected, the respective proportions were 32.1%, 38.3% and 29.6%. Management estimates that if all of the plastic waste currently collected in the UK was gasified, it would support 500 25tpd DMG units. We note that while plastic waste is currently receiving most media attention, this is not the only type of waste that can be gasified by PowerHouse’s DMG technology. In 2017, UK household waste totalled 26.9m tonnes (2016: 27.3m), 45.0% (2016: 44.7%) of which was recycled.

The regulatory environment is moving in favour of recycling. In January 2018, the EU announced its Plastic Waste strategy, under which all plastic packaging on the EU market would be recyclable by 2030, the consumption of single-use plastics would be reduced and the intentional use of microplastics would be restricted. In response to this, the European Association of Plastic Manufacturers issued its Plastics 2030 – Voluntary Commitment, which contains a set of initiatives to achieve high rates of re-use and recycling, with the ambition to reach 60% for plastics packaging by 2030 and 100% re-use, recycling and/or recovery of all plastics packaging in the EU-28, Norway and Switzerland by 2040. In December 2018, the UK government announced its new Resources and Waste Strategy, which will extend producer responsibility for packaging, ensuring that producers pay the full costs of disposal for packaging they place on the market, stimulate demand for recycled plastic by introducing a tax on plastic packaging with less than 30% recycled plastic, ban plastic products where there is a clear case for it and alternatives exist, and improve recycling rates by ensuring that a consistent set of dry recyclable materials is collected from all households and businesses. While this government initiative primarily promotes plastic recycling, which theoretically reduces the amount of plastic available for gasification, we view this initiative as positive for PowerHouse as it will increase the amount of plastic waste collected from homes, a significant proportion of which (PowerHouse estimates around 30%) is not recyclable. In addition, the new Resources and Waste Strategy includes the objective to ‘encourage innovative waste treatment technologies that create transport fuels through the Renewable Transport Fuels Obligation’, which is directly applicable to PowerHouse’s technology.

Fuelling the hydrogen economy

An exciting opportunity for PowerHouse longer term is the ability to generate hydrogen at a local level for use in FCEVs, demand for which is being driven by concerns about the air pollution caused by petrol and diesel vehicles and the potential to reduce the carbon emissions from vehicles The International Energy Authority (IEA) notes that at the end of 2018 there were around 11,200 FCEVs globally, with sales of around 4,000 during the year, which was 80% more than 2017. Most of the sales were in California, where the Zero Emission Vehicle (ZEV) program has driven demand. While up to 2,000 small trucks powered by fuel cells were manufactured in China, only 400 were registered for road use because of the lack of refuelling infrastructure. Targets for FCEV adoption require a sharp rise in the hydrogen infrastructure required to fuel the vehicles (see Exhibit 4).

Exhibit 4: National FCEV and hydrogen fuelling station targets

Country

2020

2023

2025

2028

2030

FCEVs

US

13,000

40,000

Japan

40,000

200,000

800,000

France

5,000

20,000-50,000

China

5,000

50,000

1,000,000

Netherlands

2,000

Korea

10,000

100,000

630,00

Fuelling stations

US

80

100

Japan

160

320

France

100

400-1,000

China

100

300

500

Germany

100

400

1,000

Korea

100

210

520

Source: IEA

Most industrial hydrogen is made in steam methane reformers, which generate significant volumes of carbon dioxide, so using hydrogen made this way in refuelling stations goes against the premise of reducing carbon dioxide emission and the use of fossil fuels. Instead of using hydrogen that has been manufactured in this way and transported over a considerable distance, most of the refuelling stations currently deploy on-site electrolysis technology from Hydrogenics or ITM Power. This technology uses electricity, potentially but not necessarily from renewable sources, to split water into oxygen and a hydrogen that is sufficiently pure for fuel cell operation. The cost of conversion per kilogram of hydrogen produced this way is significant. The small footprint of the DMG unit means it could be used as an alternative mechanism for producing hydrogen on site, which is net negative with regards to carbon dioxide emissions. Moreover, as the waste can be processed close to where it was originally produced, as for example in local community DMC deployments, the carbon footprint associated with transporting it is significantly reduced, especially if the alternative is shipping the waste overseas.

Providing balance in the renewable energy mix

UK government statistics show that renewables have increased from 3% of electricity generation capacity in 1996 to 39% in 2017.This increase in renewable sources means the power generation industry will need to invest in improved transmission networks to move the energy to where it is required, in storage (the government study estimates 3GW of battery storage by 2030) and in intermittent generation systems to address the variability in output from wind turbines. While energy derived from waste is currently a very small proportion of all energy generated in the UK, with municipal waste combustion accounting for only 6% of all renewable energy used in 2017, in the future it could provide a mechanism for addressing imbalances between energy demand and supply. While this is not an immediate opportunity for PowerHouse, we believe that it merits attention.

This is because less than half of the UK’s energy-from-waste plants are accredited as ‘recovery operations rather than ‘disposal’. Most of those classified as recovery operations are incineration plants, generating electricity during the time that the waste material is being burnt. In contrast, the syngas produced by PowerHouse’s DMG technology may be stored until additional generation capacity needs to be brought online to offset a drop in output from wind or solar sources, making it a better addition to the renewables mix. Moreover, the PowerHouse technology is scaled to be appropriate for disposing of waste close to where it is produced and generating electricity close to where it will be consumed, reducing the financial and energy cost of transporting both waste and electricity. This is in contrast to centralised power generation systems, where around 8% of the initial energy content in the gas is dissipated as the electricity is distributed over the grid to household or business premises.

Exhibit 5: Number of EfWs in UK

Exhibit 6: EfW capacity UK

Source: Tolvik Consulting

Source: Tolvik Consulting

Exhibit 5: Number of EfWs in UK

Source: Tolvik Consulting

Exhibit 6: EfW capacity UK

Source: Tolvik Consulting

Executing the strategy

Refining the technology

During FY17 and FY18, PowerHouse focused on improving the performance of its third-generation 1–3tpd demo DMG unit at Thornton Science Park on Merseyside. This demonstration unit was used as the basis for the front-end engineering design for a full-scale unit. While this has not been constructed, the independent validation by DNV GL confirmed that this design can process 25tpd of high calorific waste, generating electricity and, in conjunction with other equipment, produce up to two tonnes of hydrogen per day. The design incorporates pre-fabricated components and pre-assembled piping and structures to make it easy to install. The components have been sourced from manufacturers with proven design, manufacturing and operating experience who will provide guarantees for the component operation in the DMG system.

The demonstration unit has also been used to conduct tests on many different forms of plastic feedstock for recyclers, including a number of internationally recognised waste companies, which may potentially host DMG units at their sites. Feedstocks included shred tyres, mixed automotive plastic, cable insulation, shredded labels and mixed plastics, shredded beach waste, solid recovered fuel (SRF) and biomass. Successful execution at the Protos site should help convert this interest into more widespread adoption of the technology.

Exhibit 7: Technology milestones

Date

Milestone

H117

Modification of control systems to meet the UK safety standards, enhancements to gas systems and revision of feed and steam generation systems in conjunction with local engineering consultancy Engsolve. Sequence of extended tests to check on the suitability of different feedstock types, to provide thorough analysis of the gas output, to supply detailed operational data for designing the first commercial unit and to demonstrate the technology to interested parties.

August 2017

In-house demonstration that the syngas produced contained over 50% hydrogen, some carbon monoxide and methane and no carbon dioxide.

October 2017

Confirmation by independent third-party laboratory that conventional pressure swing adsorption (PSA) equipment is able to separate and clean up the hydrogen component of the syngas to fuel cell quality, ie 99.999% purity.

November 2017

Completion of technology trials preparatory to starting the design and engineering of the first commercial-scale unit.

March 2018

Demonstration unit in operation for six months.

June 2018

Demonstration unit connected to Thornton Park micro-grid.

July 2018

Generic Front-End Engineering Design (FEED) for 25tpd unit complete.

October 2018

Independent validation of full-scale design by DNV GL confirms that a unit could convert 25tpd of feedstock comprising high calorific value waste material and that the energy-rich syngas can be combusted to produce power for distributed electrical generation. Also, that the DMG technology allows for integration of a process for the co-production of high-purity hydrogen from a proportion of the syngas in addition to generating power.

Date

H117

August 2017

October 2017

November 2017

March 2018

June 2018

July 2018

October 2018

Milestone

Modification of control systems to meet the UK safety standards, enhancements to gas systems and revision of feed and steam generation systems in conjunction with local engineering consultancy Engsolve. Sequence of extended tests to check on the suitability of different feedstock types, to provide thorough analysis of the gas output, to supply detailed operational data for designing the first commercial unit and to demonstrate the technology to interested parties.

In-house demonstration that the syngas produced contained over 50% hydrogen, some carbon monoxide and methane and no carbon dioxide.

Confirmation by independent third-party laboratory that conventional pressure swing adsorption (PSA) equipment is able to separate and clean up the hydrogen component of the syngas to fuel cell quality, ie 99.999% purity.

Completion of technology trials preparatory to starting the design and engineering of the first commercial-scale unit.

Demonstration unit in operation for six months.

Demonstration unit connected to Thornton Park micro-grid.

Generic Front-End Engineering Design (FEED) for 25tpd unit complete.

Independent validation of full-scale design by DNV GL confirms that a unit could convert 25tpd of feedstock comprising high calorific value waste material and that the energy-rich syngas can be combusted to produce power for distributed electrical generation. Also, that the DMG technology allows for integration of a process for the co-production of high-purity hydrogen from a proportion of the syngas in addition to generating power.

Source: Company data

Forming partnerships to commercialise the technology

Now that the design is complete, PowerHouse can offer proposals for the deployment of DMG at waste management sites. As noted above, it is working with partners to accelerate commercial engagement. Once the first commercial site in the UK is operational, PowerHouse intends to target multiple sites in the UK and overseas. As well as the pipeline of opportunities on Peel sites, it has received interest from internationally recognised waste companies, from major industrial complexes wanting to provide energy for their sites with net zero carbon dioxide emissions and from local councils.

PowerHouse intends to adopt the licencing and partner engagement model to penetrate international markets, focusing initially on Spain, Japan, Korea and other parts of Asia. Japan is a key market because the government is keen to reduce its reliance on fuel imports. After the shut-down of many nuclear power plants in the wake of the Fukushima disaster in 2011, imported fossil fuel now accounts for over 90% of Japan’s primary energy supply. A third of this fuel is petrol from the Middle East, the supply of which is subject to geopolitical risks. In addition, the government has set targets of a 26% reduction in greenhouse gas emissions between 2013 and 2030 and an 80% reduction of current levels by 2050. Widespread adoption of DMG would provide a stable, secure supply of carbon dioxide-neutral hydrogen generated from plastic waste produced within Japan.

First full-scale DMG project in Ellesmere Port

The most commercially advanced project so far will be located at Peel Environmental’s 54-acre Protos energy hub site near Ellesmere Port in Cheshire. Electricity from this project will be supplied under a Memorandum of Understanding (MoU) to recycling company Advanced Sustainable Developments (ASD), which intends to open a PET (polyethylene terephthalate) plastics recycling facility at Protos. Under the terms of the MoU, the electricity generated by the DMG system will be fed into a private grid on the Protos site and supplied at a discount (no information on the magnitude of this discount is available at the moment) to current power market prices to ASD. In addition, ASD has agreed to supply the DMG unit with unrecyclable plastic for use as feedstock, paying a price for disposal that is significantly below current landfill prices.

Development partners Peel and W2T now have a site for the first DMG operation, a customer for the electricity and hot water generated, and a primary feedstock as well as a back-up supply. In April, PowerHouse was engaged to carry out tests on the proposed PET feedstock and provide a front-end engineering design for a commercial-scale DMG unit using this particular feedstock. This engineering work is preparatory to the developers securing planning and operating permits. The first stage of the engineering work, modelling noise and emissions has been completed, confirming that there are no emission regulation issues. The results have been shared with the local community and councils as part of a consultation process prior to applying for planning permission. This will be submitted at the same time as an operating permit is applied for. Peel and W2T continue to seek financing for the plant. These discussions should be supported by the announcement of the formal collaboration with Peel at another 10 sites (see below), which is a strong endorsement of DMG. Moreover Peel, which is leading engagement with potential hydrogen customers, intends to become actively involved in the financing discussions. When these steps are completed, the developers can proceed to the construction and commissioning phase, triggering the payment of operating licence fees to PowerHouse post commissioning.

Collaboration with Peel Environmental extends pipeline

PowerHouse has recently signed a collaboration agreement with Peel Environmental. This seeks to develop 11 DMG facilities at sites in the UK, primarily on Peel’s land, including Protos. The collaboration is part of Peel’s strategy to develop ‘Plastic Parks’ where waste plastics that cannot be recycled are used to generate electric power and hydrogen rather than being sent to landfill. W2T will act as project developer for each facility. Peel will provide suitable sites on industrial parks, fit the infrastructure, identify sources of waste plastic and purchasers of power and hydrogen and help W2T secure funding from investors for each site. As with the Protos site, PHE will receive fees for each project for carrying out tests on the proposed feedstock and providing a customised front-end engineering design. Additionally, once each plant is commissioned, PHE will receive operating licence fees. Peel estimates that the development costs for this enlarged pipeline of 11 sites would be at least £130m.

Next steps

PowerHouse is currently focused on completing the front-end engineering design for the DMG unit at the Protos site. This information will be included when W2T applies for planning and operating permits for the plant in September in anticipation of receiving planning permission in October. We note that PowerHouse is in further negotiations for contracts for DMG applications at a number of other UK sites as well. This includes testing feedstocks and using data from the demonstration equipment to assess the feasibility of DMG installation at potential host sites. These activities should help W2T secure additional development projects when the Protos project is operational, as well as generating revenues in the short term.

Management

In February 2019 the former CEO and MD of Thyssenkrupp Industrial Solutions’ Oil & Gas business unit for the UK, David Ryan, became CEO, having been in charge of PowerHouse’s programme development since February 2017. Prior to his employment with Thyssenkrupp, he founded and built a successful engineering consulting organisation, Energy & Power, which was acquired by Thyssenkrupp in 2012. Until February 2019, David was also a director of W2T, acting as a director of PowerHouse under a director swap. He relinquished the W2T role on becoming PowerHouse’s CEO. The leadership change reflects the company’s move closer to commercialisation, with technical engagement now being a crucial part of the sales and delivery process. The other members of the executive team are Bruce Nicholson and Christopher Vanezis. Bruce was appointed commercial operations manager in April 2018. He previously worked for an independent project management company, where he was involved with a wide range of organisations including multi-nationals, such as Thyssenkrupp, EDF, Tullow Oil and BHP, as well as smaller independents. Christopher became CFO in March 2017. He is a chartered accountant with c 30 years’ experience in the energy sector, including major infrastructure projects both in the UK and internationally, and is also Waste2Tricity’s finance manager.

The former chief executive of Alkane Energy, Dr Cameron Davies, has been non-executive chairman since October 2017. As chief executive of Alkane Energy, he led the business from its formation in 1994, through venture capital funding and IPO to become a profitable operator of c 160MW of gas to power generation plants. He resigned as director in 2015 when Alkane was acquired by Balfour Beatty Infrastructure Partners for £60m.

Sensitivities

Regulatory impact: the EU Waste Framework Directive is broadly beneficial for PowerHouse Energy as the legislation makes it more economically attractive for businesses to use waste to produce energy rather than sending it to landfill. However, it also favours recycling materials such as plastics, rather than recovering the energy content from the material, potentially limiting the amount of high caloric value waste available for gasification. Management believes that in practice there will be sufficient energy-rich material available that is not suitable for recycling because it cannot be separated efficiently from other waste streams. In addition, the need to secure permits from the relevant local authority to operate reactors may delay commissioning a new plant by over a year. For example, planning permission for the proposed plasma gasification waste-to-energy plant at Bilsthorpe, Nottinghamshire, in which both Peel Environmental and Waste2Tricity are involved, was submitted in July 2014, but the proposal only received approval from the secretary of state in June 2016.The independent international consultancy Fichtner has demonstrated that the DMG process is fully compliant with the legislative emission levels for operation in the UK and elsewhere in the EU.

Availability of waste: the economic case for PowerHouse Energy’s technology depends on the level of gate fees. These are dependent on the relative availability of waste and reduce if there is an excess of waste-to-energy capacity. As it is more efficient to run the DMG units continuously, it is essential for operators to secure a steady stream of waste feedstock of appropriate quality. It is likely, therefore, that units will be located on combined waste disposal/energy generation complexes. We note that a plasma gasification plant which operated successfully in Utashinai, Japan, closed in 2013 because it lost its waste supply contracts. China’s decision to ban imports of plastic waste for recycling in 2017 has increased the availability of suitable input material. However, the construction of more waste-to-energy plants, for example Biffa is proposing to construct two facilities with Covanta each with a capacity of 350ktpa, one of which will be located on the Protos site, will make sourcing waste more difficult. Management believes that in practice there will be sufficient energy-rich material available that cannot be processed by other waste-to-energy technology.

FCEV adoption: the roll-out of waste-to-energy plants outputting hydrogen for refuelling stations is predicated on volume adoption of FCEVs. This is not certain and will depend, in our opinion, on fuel cell manufacturers succeeding in bringing down the cost of the technology and on FCEVs retaining a range advantage compared with battery-powered electric vehicles. We note that the DMG reactors will initially be configured to produce electricity and will gradually switch to hydrogen production as demand increases. If demand does not increase as expected, DMG technology will still be a viable route for simultaneously disposing of plastic waste and generating electricity.

Technology still at pre-commercial phase: an independent body has confirmed that the scaled-up reactor design is capable of processing up to 50tpd of waste and converting it to two tonnes of hydrogen gas. This information was used to calculate the IRR of over 30%. DNV GL has also carried out a safety review. Additionally, the 1–3tpd demonstrated plant has proved itself able to generate electricity and to process multiple types of waste streams, and the syngas it outputs has been verified by a third party as sufficiently pure for use with a fuel cell. However, there is no guarantee that the scaled-up technology will generate syngas or electricity consistently over an extended period when working in a commercial environment, and the hydrogen produced from syngas has not been used with an actual fuel cell, so while technical risk has been reduced, it has not been eliminated. Although switching to components that have been proven in similar situations has significantly reduced the risk profile, the company continues to work with the independent body that validated the DPG design to address items DNV GL identified as presenting risks to scale-up. Many risks have been removed or mitigated following experience gained from working on pyrolysis equipment in Spain for a third party. Successful development of the first commercial sites will remove this risk.

Dependence on related parties: since staffing levels and other costs are being kept to a minimum to conserve cash, PowerHouse’s growth is reliant on related parties who may take a substantial proportion of any profits generated. For example, industry facilitator W2T receives a contribution to costs each month, which is currently being paid in shares. These advances will be reimbursed by W2T out of any profits earned from project development. We note that Waste2Tricity is owned by Howard White, founder of AFC Energy, whose son is the sole owner of Yady Worldwide, a significant investor in both AFC Energy and PowerHouse. David Ryan is also a director of Engsolve and Nayr Consultants, both of which provide engineering services to PowerHouse.

Valuation

PowerHouse did not generate any revenue during FY18 and as yet there is insufficient information on future performance to construct estimates. This precludes the use of either peer-based multiples or a DCF to conduct a formal valuation analysis. Management notes that the price of a DMG unit would be in the high single-digit millions of pounds per site and expects to realise a gross profit of c 10–12%, representing a gross profit of c £0.8–0.9m per DMG unit deployed.

The company has a pipeline of opportunities on over 30 sites where it is already in meaningful dialogue, for example discussing the suitability of feedstock. If we assume that operating costs increase to c £2m to support commercial operation, we calculate that the company will reach break-even on sales of two units per year and generate c £6m operating profit on annual sales of 10 units.

Financials

Cost-base increases during FY18 in preparation for commercialisation

In February 2018, management expected that it would have the first commercial 25tpd unit built, installed and commissioned by the end of that year. However, in September 2018, management noted that although it was in active negotiations with a number of early adopter customers, commercial deployment had been pushed out to H219 because of delays in securing financing and reliable sources of waste material for processing. As a result, there were no revenues reported for FY18. Administrative costs grew by £0.7m year-on-year to £2.5m. R&D expenses (27% of total costs), which included fees to Engsolve, DNV GL and Nayr Consultants, increased by £146k reflecting work on the front-end engineering design. Staff costs, which were primarily directors’ fees (14% of total), rose by £135k. Share-based payments (22% of total) grew by £359k. These include £168k arising from the issue of options to directors (FY17: £0k) and £352k shares issued in payment to some of the company’s services providers. In addition, £116k was spent on share issue fees (FY17: £0k). Operating losses widened by 38% to £2.5m. Finance costs reduced from £70k to a minimal £0.2k, reflecting the settlement of a substantial loan from former investor Hillgrove in February 2017. Losses before tax (adjusted for share-based payments) widened by 16% to £1.9m.

Balance sheet significantly strengthened during FY18

The company started FY18 with £0.8m cash. In February and March 2018, it issued 280.4m shares (at 0.5p or £1.4m) as part of the settlement of the Hillgrove loan (£2m cash payout in 2017 and £1.4m shares conversion in 2018). These were originally shown as a loan on the balance sheet because they were subject to a lock-in. Cash was back at £0.8m at end-December and the Hillgrove loan eliminated. The £1.9m cash used in operations and loan repayment was balanced by three fund-raising exercises, all at 0.5p/share, collectively generating £3.4m (net). The number of shares in issue increased by 719.6m during the year to 1,856.4m at the year end.

Sufficient funding until at least end June 2020

The notes to the FY18 accounts state that the directors have prepared working capital projections which show that the cash balance at end FY18 is sufficient to enable PowerHouse to continue operations for the foreseeable future. This conclusion is based on signed agreements from all the directors and certain contractors to waive future remuneration or fees and a letter of support from one of its shareholders, who is also a director of the company, that he intends to make up to £300k available for at least 12 months from the end of June 2019. By mid-FY21, the company expects to be generating substantial revenues from licences as multiple DMG plants are deployed. Since cash consumption depends on how long it takes for Peel and W2T to secure funding for the first DMG deployment and the level of revenues PowerHouse can derive from providing engineering services, there remains a risk, in our opinion, that the company will need to raise more finance. The directors believe they will be able to raise further funds as and when required and would consider either issuing new equity capital or other sources

The company is using a variety of measures to keep costs down. As well as getting directors and certain contractors to waive fees, it has undertaken an operational review to reduce monthly overhead by over 25%. This review focuses resources on the first commercial site. During FY18, it upgraded the demonstration apparatus and acquired laboratory equipment for a minimal amount so it can generate revenues from conducting trials on potential feedstocks. This will help the company achieve its objective of starting to generate cash in FY19 from the delivery of engineering and consulting support to customers for feasibility and development services, and of becoming cash positive at an operational level during FY20. Waiving fees does not appear materially dilutive. In April, the company issued 24.1m shares to various service providers, 1.8m shares to the CEO and 3.2m shares to the CFO in lieu of fees.

Exhibit 8: Financial summary

Year end 31 Dec

£'000s

2014

2015

2016

2017

2018

PROFIT & LOSS

Revenue

 

0

0

0

0

0

Cost of Sales

0

0

0

0

0

Gross Profit

0

0

0

0

0

EBITDA

 

(1,182)

(397)

(784)

(1,609)

(1,940)

Operating Profit (pre amort. of acq intangibles & SBP)

 

(1,182)

(397)

(784)

(1,610)

(1,941)

Amortisation of acquired intangibles

0

0

0

0

0

Share-based payments

0

0

(68)

(195)

(554)

Exceptionals

(1,038)

0

0

0

0

Operating Profit

(2,221)

(397)

(852)

(1,805)

(2,495)

Net Interest

(329)

(385)

(482)

(70)

(0)

Profit Before Tax (norm)

 

(1,512)

(782)

(1,266)

(1,680)

(1,941)

Profit Before Tax (FRS 3)

 

(2,550)

(782)

(1,334)

(1,875)

(2,495)

Tax

0

0

0

0

145

Profit After Tax (norm)

(1,512)

(782)

(1,266)

(1,680)

(1,796)

Profit After Tax (FRS 3)

(2,550)

(782)

(1,334)

(1,875)

(2,350)

Average Number of Shares Outstanding (m)

376.6

390.1

551.4

975.1

1,541.7

EPS - normalised (p)

 

(0.40)

(0.20)

(0.23)

(0.17)

(0.12)

EPS - normalised fully diluted (p)

 

(0.40)

(0.20)

(0.23)

(0.17)

(0.12)

EPS - FRS 3 (p)

 

(0.68)

(0.20)

(0.24)

(0.19)

(0.15)

Dividend per share (p)

0.00

0.00

0.00

0.00

0.00

Gross Margin (%)

N/A

N/A

N/A

N/A

N/A

EBITDA Margin (%)

N/A

N/A

N/A

N/A

N/A

Operating Margin (before GW and except.) (%)

N/A

N/A

N/A

N/A

N/A

BALANCE SHEET

Fixed Assets

 

0

0

2

3

2

Intangible Assets

0

0

0

0

0

Tangible Assets

0

0

2

3

2

Current Assets

 

6

177

154

839

1,049

Stocks

0

0

0

0

0

Debtors

6

1

6

88

905

Cash

0

176

148

750

145

Current Liabilities

 

(2,416)

(199)

(3,383)

(1,643)

(247)

Creditors including tax, social security and provisions

(235)

(199)

(51)

(241)

(247)

Short term borrowings

(2,181)

0

(3,332)

(1,402)

0

Long Term Liabilities

 

0

(2,939)

0

0

0

Long term borrowings

0

(2,939)

0

0

0

Other long term liabilities

0

0

0

0

0

Net Assets

 

(2,410)

(2,960)

(3,227)

(802)

804

CASH FLOW

Operating Cash Flow

 

(1,961)

(813)

(637)

(1,311)

(1,909)

Net Interest

(329)

(385)

(482)

(70)

(0)

Tax

0

0

0

0

0

Capital expenditure

0

0

(2)

(1)

(0)

Capitalised product development

0

0

0

0

0

Acquisitions/disposals

0

0

0

0

0

Equity financing

1,225

231

701

4,104

3,402

Dividends

0

0

0

0

0

Net Cash Flow

(1,066)

(966)

(421)

2,722

1,493

Opening net debt/(cash)

 

1,490

2,181

2,763

3,184

652

Finance leases

0

0

0

0

0

Other

(375)

(384)

0

190

0

Closing net debt/(cash)

 

2,181

2,763

3,184

652

(840)

Source: Company data

Contact details

Revenue by geography

PowerHouse Energy Group
10b Russell Court, Woolgate,
Cottingley Business Park, Bingley,
BD16 1PE, United Kingdom
+44 (0)20 3368 6399
www. powerhousegroup.co.uk

N/A

Contact details

PowerHouse Energy Group
10b Russell Court, Woolgate,
Cottingley Business Park, Bingley,
BD16 1PE, United Kingdom
+44 (0)20 3368 6399
www. powerhousegroup.co.uk

Revenue by geography

N/A

Management team

Non-executive Chairman: Dr Cameron Davies

CEO: David Ryan

Dr Davies is an international energy sector specialist with a good track record of growing profits in a quoted energy company. As chief executive of Alkane Energy, he led the business from its formation in 1994, through venture capital funding and IPO to become a profitable operator of c 160MW of gas to power generation plants. He resigned as director in 2015 when Alkane was acquired by Balfour Beatty Infrastructure Partners for £60m. He is also non-executive chairman of Ascent Resources. He became chairman in October 2017.

Mr Ryan was appointed as a non-executive director in February 2017 and assumed an executive role in March that year before moving to his current role in February 2019. He was previously the former CEO and MD of Thyssenkrupp Industrial Solutions’ Oil & Gas business unit for the UK. He has over 30 years of complex engineering, business development and project management experience. He was a director of Waste2Tricity until February 2019.

Commercial Operations Director: Bruce Nicholson

CFO: Christopher Vanezis

Bruce was appointed commercial operations manager in April 2018. Prior to that he worked for Cinch Projects, an independent project management company, where he engaged with a wide range of organisations including multinationals, such as Thyssenkrupp, EDF, Tullow Oil and BHP, and also with smaller independents.

Christopher became CFO in March 2017. He is a chartered accountant with c 30 years’ experience in the energy sector, in roles with Midlands Electricity, Cinergy Corp and Express Energy Holding. He has worked on major infrastructure projects, both in the UK and internationally, and is also Waste2Tricity’s finance manager.

Management team

Principal shareholders

(%)

Hargreaves Lansdown (Nominees) A/C 15942

10.4

Hargreaves Lansdown (Nominees) A/C VRA

8.0

Lawshare Nominees A/C SIPP

6.4

Paul Warwick

5.8

Interactive Investor Services Nominees A/5.6C SMKTISAS

5.6

Barclays Direct Investing Nominees

5.3

Yady Worldwide

5.2

Companies named in this report

AFC Energy (AFC:LN), Alkane Energy (ALK:LN), Ascent Resources (AST:LN), Biffa (BIFF:LN), Covanta (CVA:US), Hydrogenics (HYGS:US), ITM Power (ITM:LN)

General disclaimer and copyright

This report has been commissioned by PowerHouse Energy Group and prepared and issued by Edison, in consideration of a fee payable by PowerHouse Energy Group. Edison Investment Research standard fees are £49,500 pa for the production and broad dissemination of a detailed note (Outlook) following by regular (typically quarterly) update notes. Fees are paid upfront in cash without recourse. Edison may seek additional fees for the provision of roadshows and related IR services for the client but does not get remunerated for any investment banking services. We never take payment in stock, options or warrants for any of our services.

Accuracy of content: All information used in the publication of this report has been compiled from publicly available sources that are believed to be reliable, however we do not guarantee the accuracy or completeness of this report and have not sought for this information to be independently verified. Opinions contained in this report represent those of the research department of Edison at the time of publication. Forward-looking information or statements in this report contain information that is based on assumptions, forecasts of future results, estimates of amounts not yet determinable, and therefore involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of their subject matter to be materially different from current expectations.

Exclusion of Liability: To the fullest extent allowed by law, Edison shall not be liable for any direct, indirect or consequential losses, loss of profits, damages, costs or expenses incurred or suffered by you arising out or in connection with the access to, use of or reliance on any information contained on this note.

No personalised advice: The information that we provide should not be construed in any manner whatsoever as, personalised advice. Also, the information provided by us should not be construed by any subscriber or prospective subscriber as Edison’s solicitation to effect, or attempt to effect, any transaction in a security. The securities described in the report may not be eligible for sale in all jurisdictions or to certain categories of investors.

Investment in securities mentioned: Edison has a restrictive policy relating to personal dealing and conflicts of interest. Edison Group does not conduct any investment business and, accordingly, does not itself hold any positions in the securities mentioned in this report. However, the respective directors, officers, employees and contractors of Edison may have a position in any or related securities mentioned in this report, subject to Edison's policies on personal dealing and conflicts of interest.

Copyright: Copyright 2019 Edison Investment Research Limited (Edison). All rights reserved FTSE International Limited (“FTSE”) © FTSE 2019. “FTSE®” is a trade mark of the London Stock Exchange Group companies and is used by FTSE International Limited under license. All rights in the FTSE indices and/or FTSE ratings vest in FTSE and/or its licensors. Neither FTSE nor its licensors accept any liability for any errors or omissions in the FTSE indices and/or FTSE ratings or underlying data. No further distribution of FTSE Data is permitted without FTSE’s express written consent.

Australia

Edison Investment Research Pty Ltd (Edison AU) is the Australian subsidiary of Edison. Edison AU is a Corporate Authorised Representative (1252501) of Crown Wealth Group Pty Ltd who holds an Australian Financial Services Licence (Number: 494274). This research is issued in Australia by Edison AU and any access to it, is intended only for "wholesale clients" within the meaning of the Corporations Act 2001 of Australia. Any advice given by Edison AU is general advice only and does not take into account your personal circumstances, needs or objectives. You should, before acting on this advice, consider the appropriateness of the advice, having regard to your objectives, financial situation and needs. If our advice relates to the acquisition, or possible acquisition, of a particular financial product you should read any relevant Product Disclosure Statement or like instrument.

New Zealand

The research in this document is intended for New Zealand resident professional financial advisers or brokers (for use in their roles as financial advisers or brokers) and habitual investors who are “wholesale clients” for the purpose of the Financial Advisers Act 2008 (FAA) (as described in sections 5(c) (1)(a), (b) and (c) of the FAA). This is not a solicitation or inducement to buy, sell, subscribe, or underwrite any securities mentioned or in the topic of this document. For the purpose of the FAA, the content of this report is of a general nature, is intended as a source of general information only and is not intended to constitute a recommendation or opinion in relation to acquiring or disposing (including refraining from acquiring or disposing) of securities. The distribution of this document is not a “personalised service” and, to the extent that it contains any financial advice, is intended only as a “class service” provided by Edison within the meaning of the FAA (i.e. without taking into account the particular financial situation or goals of any person). As such, it should not be relied upon in making an investment decision.

United Kingdom

This document is prepared and provided by Edison for information purposes only and should not be construed as an offer or solicitation for investment in any securities mentioned or in the topic of this document. A marketing communication under FCA Rules, this document has not been prepared in accordance with the legal requirements designed to promote the independence of investment research and is not subject to any prohibition on dealing ahead of the dissemination of investment research.

This Communication is being distributed in the United Kingdom and is directed only at (i) persons having professional experience in matters relating to investments, i.e. investment professionals within the meaning of Article 19(5) of the Financial Services and Markets Act 2000 (Financial Promotion) Order 2005, as amended (the "FPO") (ii) high net-worth companies, unincorporated associations or other bodies within the meaning of Article 49 of the FPO and (iii) persons to whom it is otherwise lawful to distribute it. The investment or investment activity to which this document relates is available only to such persons. It is not intended that this document be distributed or passed on, directly or indirectly, to any other class of persons and in any event and under no circumstances should persons of any other description rely on or act upon the contents of this document.

This Communication is being supplied to you solely for your information and may not be reproduced by, further distributed to or published in whole or in part by, any other person.

United States

The Investment Research is a publication distributed in the United States by Edison Investment Research, Inc. Edison Investment Research, Inc. is registered as an investment adviser with the Securities and Exchange Commission. Edison relies upon the "publishers' exclusion" from the definition of investment adviser under Section 202(a)(11) of the Investment Advisers Act of 1940 and corresponding state securities laws. This report is a bona fide publication of general and regular circulation offering impersonal investment-related advice, not tailored to a specific investment portfolio or the needs of current and/or prospective subscribers. As such, Edison does not offer or provide personal advice and the research provided is for informational purposes only. No mention of a particular security in this report constitutes a recommendation to buy, sell or hold that or any security, or that any particular security, portfolio of securities, transaction or investment strategy is suitable for any specific person.

Frankfurt +49 (0)69 78 8076 960

Schumannstrasse 34b

60325 Frankfurt

Germany

London +44 (0)20 3077 5700

280 High Holborn

London, WC1V 7EE

United Kingdom

New York +1 646 653 7026

1,185 Avenue of the Americas

3rd Floor, New York, NY 10036

United States of America

Sydney +61 (0)2 8249 8342

Level 4, Office 1205

95 Pitt Street, Sydney

NSW 2000, Australia

Research: Consumer

Bragg Gaming Group — Doubling down on Oryx

Bragg Gaming’s core asset is Oryx Gaming, a fast growing online B2B gaming solution provider. We forecast C$38.4m revenues in FY19, with continued double-digit revenue growth until FY22. The underlying Oryx business is cash generative and we estimate that group EBITDA margin will expand from break-even at H119 to 7.6% next year. Investment risk is high, largely due to the need for financing, but Bragg is strategically well positioned to make accretive M&A. Key milestones will be the development of positive cash flow, as well as the successful payment of the C$32.6m contingent cash consideration for Oryx. Bragg is still an early-stage business and trades at 15.3x EV/EBITDA and 11.2x P/E for FY20e.

Continue Reading

Subscribe to Edison

Get access to the very latest content matched to your personal investment style.

Sign up for free