Provaris Energy — Impressive progress towards 2026 targets

Provaris Energy (ASX: PV1)

Last close As at 21/12/2024

0.05

0.00 (0.00%)

Market capitalisation

25m

More on this equity

Research: Industrials

Provaris Energy — Impressive progress towards 2026 targets

Provaris Energy is making material strides towards its goal of producing and supplying green hydrogen in 2026. These include the development of a new class of vessel, the GH2 carrier, the construction of an H2 production facility in Northern Australia and the delivery of a feasibility study in Western Australia for HyEnergy. If successful, the project is expected to produce attractive internal rates of return (IRRs) and be scalable in multiple global regions. Finally, at the recent AGM, shareholders approved the change of the company name from Global Energy Ventures to Provaris Energy.

Andy Murphy

Written by

Andy Murphy

Director, Financials & Industrials

Industrials

Provaris Energy

Impressive progress towards 2026 targets

Company update

Industrial support services

6 June 2022

Price

A$0.07

Market cap

A$38m

A$1.40/US$

Estimated net cash (A$m) at 30 June 2022

12.7

Shares in issue (m)

548.1

Free float

100%

Code

PV1

Primary exchange

ASX

Secondary exchange

FRA

Share price performance

%

1m

3m

12m

Abs

(26.1)

(33.0)

(14.5)

Rel (local)

(25.0)

(33.2)

(14.0)

52-week high/low

A$0.16

A$0.06

Business description

Provaris Energy is becoming a vertically integrated green hydrogen producer and supplier, combining production and compressed hydrogen shipping solutions for transporting energy from Australia to regional markets in South-East Asia, and Europe.

Next events

Interims

August 2022

Analysts

Andy Murphy

+44 (0)20 3077 5700

James Magness

+44 (0)20 3077 5700

Provaris Energy is a research client of Edison Investment Research Limited

Provaris Energy is making material strides towards its goal of producing and supplying green hydrogen in 2026. These include the development of a new class of vessel, the GH2 carrier, the construction of an H2 production facility in Northern Australia and the delivery of a feasibility study in Western Australia for HyEnergy. If successful, the project is expected to produce attractive internal rates of return (IRRs) and be scalable in multiple global regions. Finally, at the recent AGM, shareholders approved the change of the company name from Global Energy Ventures to Provaris Energy.

Year end

Revenue
(A$m)

PBT*
(A$m)

EPS*
(c)

DPS
(c)

P/E
(x)

Yield
(%)

06/20

1.5

(2.9)

(0.7)

0.0

N/A

N/A

06/21

0.2

(3.1)

(0.7)

0.0

N/A

N/A

06/22e

0.0

(6.4)

(1.3)

0.0

N/A

N/A

06/23e

0.0

(7.4)

(1.3)

0.0

N/A

N/A

Note: *PBT and EPS are normalised, excluding amortisation of acquired intangibles, exceptional items and share-based payments.

Progress on schedule

In recent months, Provaris Energy has made significant progress in each of its three key projects, which keeps it firmly of track to hit 2026 targets. Firstly, in May it signed a Memorandum of Understanding (MoU) with Northern Marine, a subsidiary of Stena, which gives credibility to its GH2 carrier project and to the new vessel class, as well as supporting its development and operation. Secondly, the Environmental Impact Assessment (EIA) referral submission and the pre-feasibility study (PFS) for the Tiwi H2 project remain on track for completion in June, enabling offtake and strategic partner discussions to progress. Finally, it achieved a number of milestones in the feasibility study for its HyEnergy Project.

GH2 carrier addresses geopolitical energy issues

High energy prices, tougher environmental legislation and risks to global energy supply (for example, Russia’s invasion of Ukraine) are pushing stakeholders to consider the future of energy. Provaris Energy has the potential to address these themes, with its novel compressed green hydrogen carrier (GH2), discussed in more detail in our themes note Geopolitical conflict to drive renewables surge, published on 30 May. We also highlighted the exciting opportunities for hydrogen in our December 2020 note on the hydrogen economy.

Progress to date keeps project IRRs within sight

In our initiation note, our modelling assumed that a supply of green hydrogen would be available to purchase from third parties at a delivered price of US$4/kg. This produced IRRs of 9.7–18.7% from a range of scenarios and vessel sizes. Our assumptions remain relevant and are unchanged. The addition of the Tiwi Hydrogen Project to the GH2 carrier initiative gives Provaris Energy the opportunity to become the world’s first truly green, vertically integrated hydrogen producer and supplier of compressed H2 at scale. Successful offtake discussions would be an opportunity to revisit our IRR assumptions.

Material progress made of three fronts

In recent months, Provaris Energy has made significant progress in each of its three key projects. Firstly, it signed an MoU with Northern Marine, a subsidiary of Stena, which gives credibility to the project and the new vessel class, as well as supporting its development and operation. The GH2 Carrier engineering is now almost 80% complete for delivery in June. This will ensure Class Approvals progress to front end engineering design level and allow discussions with shipyards can get underway for capital cost and construction schedule estimation. Secondly, the EIA referral submission and the PFS for the Tiwi H2 project remain on track for completion in June, enabling offtake and strategic partner discussions to progress. Finally, it achieved a number of milestones in the feasibility study for its HyEnergy Project. A summary of its current position and future announcements is shown in Exhibit 1.

Exhibit 1: Timeline of approvals through to first export and operations

Source: Provaris Energy

MoU with Northern Marine highlights new ship class credibility

On 25 May 2022, Provaris Energy announced that it had signed an MoU with Northern Marine Management, a member of the Stena group. The non-binding, 12-month MoU sets out an agreed schedule of activities across multiple phases of the remaining development of Provaris Energy’s first GH2 (compressed hydrogen) carrier, which will be called H2Neo. Provaris is targeting approval for construction in mid-2023, and first operations of this new class of vessel in 2026.

The MoU and partnership with Northern Marine will cover specialist technical and operational services to support the GH2 development programme, including:

detailed engineering;

class and flag approvals;

shipyard selection and newbuild contract;

compliance and certification for safety and operations;

newbuild supervision; and

financing, insurance and operational contracts.

During the term of the MoU, both Northern Marine and Provaris will work to identify and agree terms on opportunities for the former to be appointed as ship manager for Provaris’s future fleets starting with the H2Neo (see Exhibit 2 below).

Exhibit 2: Provaris H2Neo 26,000m3/430t GH2 carrier

Source: Provaris Energy

Northern Marine, which has been in operation for nearly 40 years and manages a varied fleet of 70 vessels, has been chosen as a partner for a number of reasons. Firstly, it offers a wide suite of in-house service solutions, including ship management, marine engineering, training, marine supply and travel management. Secondly, it enjoys market-leading status in gas carrier management and the gas value chain, including the operational management of the transportation of gas. Finally, Northern Marine already manages some of the newest and greenest gas carriers and shares a vision of the future for cleaner energy solutions and more sustainable shipping.

Provaris and Northern Marine will work together to identify and support hydrogen export projects in Australia, as well as future opportunities now under review in Europe.

GH2 carrier: Detailed engineering and class approval

In addition to the MoU signed with Northern Marine discussed above, Provaris has been making significant progress on a number of other fronts relating to the GH2 carrier development process.

Firstly, Provaris’s design team and external consultants have achieved 70% completion of the contract design package (CDP), which is on track for final delivery in June 2022. There are several design and plan work packages being compiled including outline specification and the general arrangement drawing. Completed work packages are now being shared with a number of shipyards for construction scheduling and capital cost estimates, and with Class Societies to gain approval for construction in mid-2023. The packages include hull design optimisation, finite element modelling (FEM modelling is a key activity to show how the design performs under the stress of operation (loading and discharge) and while at sea), shipboard safety systems, general arrangement drawings and ship outline specification.

Secondly, ABS Consulting has been engaged to prepare studies relating to gas dispersion, fire and explosion safety in support of class verification, in particular relating to hydrogen storage tanks and cargo management. Provaris has appointed Class society the American Bureau of Shipping for the programme required for engineering, risk and safety issues and testing, with a view to achieving approval for construction in 2023 (see Exhibit 1). It may choose to appoint a second Class Society in Europe, such as DNV.

Finally, the company has engaged Singapore-based marine structural engineering company, Paaras Marine Solutions, to assess and develop port solutions for loading and unloading compressed hydrogen using the GH2 carriers in multiple locations including Asia and Europe. It is expected that the base design will be adaptable to multiple locations with site-specific customisation capability. Specifically, Paaras has been engaged to develop an onshore marine jetty and an offshore solution in Singapore, assess the existing loading facilities at Port Melville in the Tiwi Islands, together with barge storage of compressed hydrogen.

Tiwi H2 export project progress and expansion

In October 2021, Provaris Energy announced the planned development of its first green hydrogen export project in the Tiwi Islands, just off the north coast of the Northern Territory. The Tiwi H2 Project consists of a 2,540 hectare (ha) solar PV farm connected by a 30km power transmission line to a hydrogen production site (electrolyser facilities) located at an existing industrial port. Compression and loading facilities will be sited alongside, which will enable the green hydrogen to be loaded onto Provaris Energy’s compressed hydrogen ships. The solar farm was assessed to have the potential for 2.8GW of electricity generation, sufficient to produce up to 100,000 tonnes of green hydrogen a year. Please see our update note published on 19 November 2021 for more details.

In April, Provaris announced that it had made significant progress in the development and expansion of the project. The three important milestones achieved to date are as follows:

Munupi landowner support and expansion: at a meeting in March between Provaris Energy, the Munupi Landowners and the Tiwi Plantation Corporation, several permissions were requested and granted that allow Provaris to undertake the necessary environmental and engineering surveys for the EIA referral submission to be completed, and for other surveys and studies to be carried out in 2022 that relate to the project’s PFS. The permissions included a 780ha increase in the land available for solar generation to c 2,580ha, and an additional 40ha, to 72ha, for land adjacent to the port for hydrogen production and compression facilities.

Singapore marketing of Tiwi H2 for offtake and investment: with the help of the Australian High Commission, Provaris Energy’s management completed a roadshow to demonstrate the project to key government agencies, offtake groups and sovereign investment funds. It received support and further engagement has followed subsequently as the Tiwi H2 project fits well with the country’s hydrogen strategy.

Consultants appointed to provide project delivery expertise: Provaris has appointed CE Partners to help with the design, construction, operation and generation modelling of the proposed 2.8GW solar farm and the 30km transmission line. CE Partners has more than 20 years of experience in the renewable space, including Cohuna Solar Farm (34MW), Gannawarra Solar Farm (60MW), Gannawarra Energy Storage System, Wemen Solar Farm (97MW) and Clermont Solar Farm (93MW).

Exhibit 3: Tiwi H2 solar site and additional solar farm

Source: Provaris Energy

The next steps for the project include completion of the environmental and engineering surveys and studies by the end of June, preparation and commencement of solar monitoring at two locations by the end of September and the request for proposal and appointment of lead consultants by the end of June 2022. Preliminary marketing activities for investment and offtake agreements in the markets of Singapore, Japan and Korea will continue.

HyEnergy Export Project feasibility study developments

The HyEnergy Project is a potential ‘renewable green hydrogen project’ located in the Gascoyne region of Western Australia. In August 2021, Provaris Energy entered into a non-binding MoU with Province Resources and Total Eren, together as the HyEnergy Project partners, to support a technical feasibility study on exporting green hydrogen using compressed shipping from the 8GW facility, to markets in the Asia-Pacific region. The HyEnergy feasibility study is due to be completed in June 2022. The study team consists of WSP, Oropesa, ERM and Turner & Townsend.

In Q122, the project team advanced or achieved a number of milestones, including:

Offshore site location of proposed moorings, connected to subsea and onshore pipeline to transport compressed hydrogen from electrolyser to the GH2 carriers.

Assessment of the environmental risks and constraints of the marine infrastructure on the Gascoyne Coast.

Design of offshore facilities including APL’s (part of NOV) Single Anchor Loading system for loading compressed hydrogen.

Design of onshore compression facilities with detailed vendor inputs, process modelling and plot plans.

Review of available onshore storage concepts.

Commercial modelling and round-trip scheduling scenarios for the proposed fleet of GH2 carriers.

Exhibit 4: Overview of the HyEnergy Project

Source: Provaris Energy

Exhibit 5: Financial summary

A$m

2019

2020

2021

2022e

2023e

June

IFRS

IFRS

IFRS

IFRS

IFRS

INCOME STATEMENT

Revenue

 

 

1.1

1.5

0.2

0.0

0.0

Cost of Sales

(1.1)

(1.5)

(0.2)

(0.0)

(0.0)

Gross Profit

0.0

0.0

0.0

0.0

0.0

EBITDA

 

 

0.0

0.0

0.0

0.0

0.0

Normalised operating profit

 

 

0.0

0.0

0.0

0.0

0.0

Amortisation of acquired intangibles

0.0

0.0

0.0

0.0

0.0

Share-based payments

0.0

0.0

0.0

0.0

0.0

Reported operating profit

0.0

0.0

0.0

0.0

0.0

Net Interest

0.0

0.0

0.0

0.0

0.0

Joint ventures & associates (post tax)

0.0

0.0

0.0

0.0

0.0

Exceptionals

0.0

0.0

0.0

0.0

0.0

Profit Before Tax (norm)

 

 

(8.9)

(2.9)

(3.1)

(6.4)

(7.4)

Profit Before Tax (reported)

 

 

(8.9)

(2.9)

(3.1)

(6.4)

(7.4)

Reported tax

0.0

0.0

0.0

0.0

0.0

Profit After Tax (norm)

(8.9)

(2.9)

(3.1)

(6.4)

(7.4)

Profit After Tax (reported)

(8.9)

(2.9)

(3.1)

(6.4)

(7.4)

Minority interests

0.0

0.0

0.0

0.0

0.0

Net income (normalised)

(8.9)

(2.9)

(3.1)

(6.4)

(7.4)

Net income (reported)

(8.9)

(2.9)

(3.1)

(6.4)

(7.4)

Basic average number of shares outstanding (m)

339.2

393.5

417.3

500.1

583.8

EPS - normalised (c)

 

 

(2.6)

(0.7)

(0.7)

(1.3)

(1.3)

Revenue growth (%)

N/A

34.9

(84.0)

(98.8)

(6.9)

Gross Margin (%)

0.0

0.0

0.0

0.0

0.0

EBITDA Margin (%)

0.0

0.0

0.0

0.0

0.0

Normalised Operating Margin

0.0

0.0

0.0

0.0

0.0

BALANCE SHEET

Fixed Assets

 

 

6.3

6.3

5.8

5.4

5.0

Intangible Assets

6.2

6.2

5.8

5.4

5.0

Tangible Assets

0.0

0.1

0.0

0.0

0.0

Investments & other

0.0

0.0

0.0

0.0

0.0

Current Assets

 

 

2.4

3.2

6.7

12.8

11.2

Stocks

0.0

0.0

0.0

0.0

0.0

Debtors

0.0

0.1

0.1

0.1

0.1

Cash & cash equivalents

2.4

3.1

6.6

12.7

11.0

Current Liabilities

 

 

(0.1)

(0.3)

(0.2)

(0.2)

(0.2)

Creditors

(0.1)

(0.2)

(0.2)

(0.2)

(0.2)

Tax and social security

0.0

0.0

0.0

0.0

0.0

Short term borrowings

0.0

0.0

0.0

0.0

0.0

Other

(0.0)

(0.1)

(0.0)

(0.0)

(0.0)

Long Term Liabilities

 

 

0.0

0.0

0.0

0.0

0.0

Long term borrowings

0.0

0.0

0.0

0.0

0.0

Net Assets

 

 

8.6

9.2

12.3

18.0

15.9

Minority interests

0.0

0.0

0.0

0.0

0.0

Shareholders' equity

 

 

8.6

9.2

12.3

18.0

15.9

CASH FLOW

Op Cash Flow before WC and tax

0.0

0.0

0.0

0.0

0.0

Receipts from the ATO (Covid-19 cash boost)

-

0.1

0.1

0.0

0.0

Payments to suppliers and employees

(2.9)

(2.9)

(2.3)

(2.5)

(2.5)

Research and development

(3.2)

(0.1)

(0.0)

(2.0)

(3.0)

Project development

(2.3)

(1.0)

(0.5)

(1.0)

(1.0)

Interest received

0.0

0.0

0.0

0.0

0.0

Interest paid for lease liabilities

-

(0.0)

(0.0)

(0.0)

(0.0)

Research and development tax concession rebate

1.0

1.4

0.2

0.0

0.0

Tax

0.0

0.0

0.0

0.0

0.0

Net operating cash flow

 

 

(7.4)

(2.5)

(2.6)

(5.5)

(6.5)

Capex

0.0

0.0

0.0

0.0

0.0

Acquisitions/disposals

0.0

0.0

0.0

0.0

0.0

Net interest

0.0

0.0

0.0

0.0

0.0

Equity financing

4.8

3.5

6.3

12.0

5.0

Other

(0.4)

(0.3)

(0.3)

(0.4)

(0.2)

Net Cash Flow

(3.0)

0.7

3.4

6.1

(1.7)

Opening net debt/(cash)

 

 

(5.4)

(2.4)

(3.1)

(6.6)

(12.7)

FX

0.0

0.0

0.0

0.0

0.0

Other non-cash movements

0.0

0.0

0.0

0.0

0.0

Closing net debt/(cash)

 

 

(2.4)

(3.1)

(6.6)

(12.7)

(11.0)

Source: Provaris Energy and Edison Investment Research


General disclaimer and copyright

This report has been commissioned by Provaris Energy and prepared and issued by Edison, in consideration of a fee payable by Provaris Energy. Edison Investment Research standard fees are £60,000 pa for the production and broad dissemination of a detailed note (Outlook) following by regular (typically quarterly) update notes. Fees are paid upfront in cash without recourse. Edison may seek additional fees for the provision of roadshows and related IR services for the client but does not get remunerated for any investment banking services. We never take payment in stock, options or warrants for any of our services.

Accuracy of content: All information used in the publication of this report has been compiled from publicly available sources that are believed to be reliable, however we do not guarantee the accuracy or completeness of this report and have not sought for this information to be independently verified. Opinions contained in this report represent those of the research department of Edison at the time of publication. Forward-looking information or statements in this report contain information that is based on assumptions, forecasts of future results, estimates of amounts not yet determinable, and therefore involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of their subject matter to be materially different from current expectations.

Exclusion of Liability: To the fullest extent allowed by law, Edison shall not be liable for any direct, indirect or consequential losses, loss of profits, damages, costs or expenses incurred or suffered by you arising out or in connection with the access to, use of or reliance on any information contained on this note.

No personalised advice: The information that we provide should not be construed in any manner whatsoever as, personalised advice. Also, the information provided by us should not be construed by any subscriber or prospective subscriber as Edison’s solicitation to effect, or attempt to effect, any transaction in a security. The securities described in the report may not be eligible for sale in all jurisdictions or to certain categories of investors.

Investment in securities mentioned: Edison has a restrictive policy relating to personal dealing and conflicts of interest. Edison Group does not conduct any investment business and, accordingly, does not itself hold any positions in the securities mentioned in this report. However, the respective directors, officers, employees and contractors of Edison may have a position in any or related securities mentioned in this report, subject to Edison's policies on personal dealing and conflicts of interest.

Copyright: Copyright 2022 Edison Investment Research Limited (Edison).

Australia

Edison Investment Research Pty Ltd (Edison AU) is the Australian subsidiary of Edison. Edison AU is a Corporate Authorised Representative (1252501) of Crown Wealth Group Pty Ltd who holds an Australian Financial Services Licence (Number: 494274). This research is issued in Australia by Edison AU and any access to it, is intended only for "wholesale clients" within the meaning of the Corporations Act 2001 of Australia. Any advice given by Edison AU is general advice only and does not take into account your personal circumstances, needs or objectives. You should, before acting on this advice, consider the appropriateness of the advice, having regard to your objectives, financial situation and needs. If our advice relates to the acquisition, or possible acquisition, of a particular financial product you should read any relevant Product Disclosure Statement or like instrument.

New Zealand

The research in this document is intended for New Zealand resident professional financial advisers or brokers (for use in their roles as financial advisers or brokers) and habitual investors who are “wholesale clients” for the purpose of the Financial Advisers Act 2008 (FAA) (as described in sections 5(c) (1)(a), (b) and (c) of the FAA). This is not a solicitation or inducement to buy, sell, subscribe, or underwrite any securities mentioned or in the topic of this document. For the purpose of the FAA, the content of this report is of a general nature, is intended as a source of general information only and is not intended to constitute a recommendation or opinion in relation to acquiring or disposing (including refraining from acquiring or disposing) of securities. The distribution of this document is not a “personalised service” and, to the extent that it contains any financial advice, is intended only as a “class service” provided by Edison within the meaning of the FAA (i.e. without taking into account the particular financial situation or goals of any person). As such, it should not be relied upon in making an investment decision.

United Kingdom

This document is prepared and provided by Edison for information purposes only and should not be construed as an offer or solicitation for investment in any securities mentioned or in the topic of this document. A marketing communication under FCA Rules, this document has not been prepared in accordance with the legal requirements designed to promote the independence of investment research and is not subject to any prohibition on dealing ahead of the dissemination of investment research.

This Communication is being distributed in the United Kingdom and is directed only at (i) persons having professional experience in matters relating to investments, i.e. investment professionals within the meaning of Article 19(5) of the Financial Services and Markets Act 2000 (Financial Promotion) Order 2005, as amended (the "FPO") (ii) high net-worth companies, unincorporated associations or other bodies within the meaning of Article 49 of the FPO and (iii) persons to whom it is otherwise lawful to distribute it. The investment or investment activity to which this document relates is available only to such persons. It is not intended that this document be distributed or passed on, directly or indirectly, to any other class of persons and in any event and under no circumstances should persons of any other description rely on or act upon the contents of this document.

This Communication is being supplied to you solely for your information and may not be reproduced by, further distributed to or published in whole or in part by, any other person.

United States

Edison relies upon the "publishers' exclusion" from the definition of investment adviser under Section 202(a)(11) of the Investment Advisers Act of 1940 and corresponding state securities laws. This report is a bona fide publication of general and regular circulation offering impersonal investment-related advice, not tailored to a specific investment portfolio or the needs of current and/or prospective subscribers. As such, Edison does not offer or provide personal advice and the research provided is for informational purposes only. No mention of a particular security in this report constitutes a recommendation to buy, sell or hold that or any security, or that any particular security, portfolio of securities, transaction or investment strategy is suitable for any specific person.

Frankfurt +49 (0)69 78 8076 960

Schumannstrasse 34b

60325 Frankfurt

Germany

London +44 (0)20 3077 5700

280 High Holborn

London, WC1V 7EE

United Kingdom

New York +1 646 653 7026

1185 Avenue of the Americas

3rd Floor, New York, NY 10036

United States of America

Sydney +61 (0)2 8249 8342

Level 4, Office 1205

95 Pitt Street, Sydney

NSW 2000, Australia

General disclaimer and copyright

This report has been commissioned by Provaris Energy and prepared and issued by Edison, in consideration of a fee payable by Provaris Energy. Edison Investment Research standard fees are £60,000 pa for the production and broad dissemination of a detailed note (Outlook) following by regular (typically quarterly) update notes. Fees are paid upfront in cash without recourse. Edison may seek additional fees for the provision of roadshows and related IR services for the client but does not get remunerated for any investment banking services. We never take payment in stock, options or warrants for any of our services.

Accuracy of content: All information used in the publication of this report has been compiled from publicly available sources that are believed to be reliable, however we do not guarantee the accuracy or completeness of this report and have not sought for this information to be independently verified. Opinions contained in this report represent those of the research department of Edison at the time of publication. Forward-looking information or statements in this report contain information that is based on assumptions, forecasts of future results, estimates of amounts not yet determinable, and therefore involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of their subject matter to be materially different from current expectations.

Exclusion of Liability: To the fullest extent allowed by law, Edison shall not be liable for any direct, indirect or consequential losses, loss of profits, damages, costs or expenses incurred or suffered by you arising out or in connection with the access to, use of or reliance on any information contained on this note.

No personalised advice: The information that we provide should not be construed in any manner whatsoever as, personalised advice. Also, the information provided by us should not be construed by any subscriber or prospective subscriber as Edison’s solicitation to effect, or attempt to effect, any transaction in a security. The securities described in the report may not be eligible for sale in all jurisdictions or to certain categories of investors.

Investment in securities mentioned: Edison has a restrictive policy relating to personal dealing and conflicts of interest. Edison Group does not conduct any investment business and, accordingly, does not itself hold any positions in the securities mentioned in this report. However, the respective directors, officers, employees and contractors of Edison may have a position in any or related securities mentioned in this report, subject to Edison's policies on personal dealing and conflicts of interest.

Copyright: Copyright 2022 Edison Investment Research Limited (Edison).

Australia

Edison Investment Research Pty Ltd (Edison AU) is the Australian subsidiary of Edison. Edison AU is a Corporate Authorised Representative (1252501) of Crown Wealth Group Pty Ltd who holds an Australian Financial Services Licence (Number: 494274). This research is issued in Australia by Edison AU and any access to it, is intended only for "wholesale clients" within the meaning of the Corporations Act 2001 of Australia. Any advice given by Edison AU is general advice only and does not take into account your personal circumstances, needs or objectives. You should, before acting on this advice, consider the appropriateness of the advice, having regard to your objectives, financial situation and needs. If our advice relates to the acquisition, or possible acquisition, of a particular financial product you should read any relevant Product Disclosure Statement or like instrument.

New Zealand

The research in this document is intended for New Zealand resident professional financial advisers or brokers (for use in their roles as financial advisers or brokers) and habitual investors who are “wholesale clients” for the purpose of the Financial Advisers Act 2008 (FAA) (as described in sections 5(c) (1)(a), (b) and (c) of the FAA). This is not a solicitation or inducement to buy, sell, subscribe, or underwrite any securities mentioned or in the topic of this document. For the purpose of the FAA, the content of this report is of a general nature, is intended as a source of general information only and is not intended to constitute a recommendation or opinion in relation to acquiring or disposing (including refraining from acquiring or disposing) of securities. The distribution of this document is not a “personalised service” and, to the extent that it contains any financial advice, is intended only as a “class service” provided by Edison within the meaning of the FAA (i.e. without taking into account the particular financial situation or goals of any person). As such, it should not be relied upon in making an investment decision.

United Kingdom

This document is prepared and provided by Edison for information purposes only and should not be construed as an offer or solicitation for investment in any securities mentioned or in the topic of this document. A marketing communication under FCA Rules, this document has not been prepared in accordance with the legal requirements designed to promote the independence of investment research and is not subject to any prohibition on dealing ahead of the dissemination of investment research.

This Communication is being distributed in the United Kingdom and is directed only at (i) persons having professional experience in matters relating to investments, i.e. investment professionals within the meaning of Article 19(5) of the Financial Services and Markets Act 2000 (Financial Promotion) Order 2005, as amended (the "FPO") (ii) high net-worth companies, unincorporated associations or other bodies within the meaning of Article 49 of the FPO and (iii) persons to whom it is otherwise lawful to distribute it. The investment or investment activity to which this document relates is available only to such persons. It is not intended that this document be distributed or passed on, directly or indirectly, to any other class of persons and in any event and under no circumstances should persons of any other description rely on or act upon the contents of this document.

This Communication is being supplied to you solely for your information and may not be reproduced by, further distributed to or published in whole or in part by, any other person.

United States

Edison relies upon the "publishers' exclusion" from the definition of investment adviser under Section 202(a)(11) of the Investment Advisers Act of 1940 and corresponding state securities laws. This report is a bona fide publication of general and regular circulation offering impersonal investment-related advice, not tailored to a specific investment portfolio or the needs of current and/or prospective subscribers. As such, Edison does not offer or provide personal advice and the research provided is for informational purposes only. No mention of a particular security in this report constitutes a recommendation to buy, sell or hold that or any security, or that any particular security, portfolio of securities, transaction or investment strategy is suitable for any specific person.

Frankfurt +49 (0)69 78 8076 960

Schumannstrasse 34b

60325 Frankfurt

Germany

London +44 (0)20 3077 5700

280 High Holborn

London, WC1V 7EE

United Kingdom

New York +1 646 653 7026

1185 Avenue of the Americas

3rd Floor, New York, NY 10036

United States of America

Sydney +61 (0)2 8249 8342

Level 4, Office 1205

95 Pitt Street, Sydney

NSW 2000, Australia

More on Provaris Energy

View All

Latest from the Industrials sector

View All Industrials content

Industrials

Carr’s Group — At an inflexion point

Solid State_resized

Industrials

Solid State — Interim results

Research: Real Estate

Regional REIT — Return to the office gathers momentum

This note focuses on the outlook for income-driven returns from Regional REIT (RGL). With the ‘return to the office’ accelerating, RGL expects a positive demand-supply balance to generate rental growth, increased occupancy and valuation gains. Q122 DPS increased c 3% to 1.65p. Income risk is mitigated by portfolio diversification, while fully fixed or hedged borrowing costs protect against further interest rate increases.

Continue Reading

Subscribe to Edison

Get access to the very latest content matched to your personal investment style.

Sign up for free