Mineral Commodities — Update 24 June 2016

Mineral Commodities — Update 24 June 2016

Mineral Commodities

Analyst avatar placeholder

Written by

Mineral Commodities

Rising production profile, exploration appeal

Project and valuation update

Metals & mining

24 June 2016

Price

A$0.14

Market cap

A$57m

US$0.72/A$

Net cash (US$m) at 31 March 2016

2.8

Shares in issue

404.9m

Free float

100%

Code

MRC

Primary exchange

ASX

Secondary exchange

N/A

Share price performance

%

1m

3m

12m

Abs

3.8

17.4

35.0

Rel (local)

4.4

14.0

42.9

52-week high/low

A$0.15

A$0.07

Business description

Mineral Commodities (MRC) is an expanding producer of non-magnetic zircon/rutile concentrate and ilmenite and garnet co-products from its high-grade Tormin resource on the west coast of South Africa. It also owns the large, early-stage Xolobeni ilmenite deposit on the east coast of South Africa.

Next events

Quarterly activities

July 2016

Analysts

Peter Chilton

+61 (0)2 9258 1161

Charles Gibson

+44 (0)20 3077 5724

Mineral Commodities is a research client of Edison Investment Research Limited

Mineral Commodities (MRC) plans to complete its Tormin plant optimisation in July 2016. It is expected to increase heavy mineral (HM) recoveries and produce higher-grade, higher value-add products and result in additional production capacity and enhanced operating flexibility. MRC will be able to capitalise on its expanded exploration programme for high-grade resources in the region.

Year end

Revenue (US$m)

PBT*
(US$m)

EPS*
(c)

DPS
(A$c)

P/E
(x)

Yield
(%)

12/14

34.9

3.9

2.1

0.0

4.9

0.0

12/15

46.4

13.1

2.7

1.0

3.8

7.1

12/16e

39.4

15.4

2.7

2.0

3.8

14.3

12/17e

89.7

41.3

7.1

6.4

1.4

46.0

Note: *PBT and EPS are normalised, excluding amortisation of acquired intangibles, exceptional items and share-based payments.

Completion of plant optimisation to lift capacity

The commissioning of the Garnet Stripping Plant (GSP) in early July 2016 will complete a programme of process plant optimisation at Tormin. It will increase the production profile and product value and substantially increase HM recoveries. Over the period CY15-17, we forecast an increase in run of mine (ROM) ore treatment from 1.6 Mtpa to 2.2Mtpa, an increase in contained zircon production from 32,000tpa to 52,000tpa (>60% growth) and an increase in rutile production from 6,000tpa to 9,000tpa (c 50% growth). We also factor in a gradual increase in ilmenite and garnet concentrate sales after a period of stock building. The plant upgrades provide potential spare capacity and the flexibility to operate at different feed grades.

Exploration acquisition strategy

MRC has actively pursued an exploration acquisition strategy to increase the operations life at Tormin. It has been awarded prospecting rights over an area of 10,500ha up to 10km offshore from the current mining area. It has also lodged prospecting licences for both coastline exploration and onshore exploration, which are currently under review for approval by the Department of Mineral Resources – South Africa. The coastal exploration represents around 24km of coastline (398ha). The onshore exploration covers an area of 1,741ha.

Valuation: Significant upside, exploration leverage

We have used NPV10 analysis to value the Tormin project and book value for the early-stage Xolobeni project. Our base case valuation is A$0.32/share (from A$0.31) for a four-year mine life. With extensive offshore, coastal and onshore exploration underway or proposed, there is potential for a longer mine life. Our upper case valuation, based on an eight-year life, is A$0.52/share (from A$0.50). The updated valuation reflects a number of relatively small changes to our model. MRC paid a maiden A$0.01/share dividend (A$4.0m) in respect of the CY15 year. Going forward, we forecast dividend increases and a high yield.

Tormin project

The Tormin mineral sands project was commissioned in January 2014. The project mines a beach mineral sands deposit located on the west coast of South Africa, around 400km north of Cape Town. The area was previously explored by Trans Hex (TSE.JSE) and others for mineral sands and diamonds.

The deposit is located approximately 50km south of the Tronox Namakwa Sands large-scale, heavy mineral sands (HMS) operation at Brand se Baai, originally developed by Anglo American.

Exploration: Significant potential to lift resources

The current beach resource is unusual in that it has been replenished by normal tidal movements since mining started, although there is no certainty this will continue at the same rate indefinitely.

MRC also has extensive exploration opportunities from offshore activities, coastline extensions and onshore potential. These have the potential to provide substantial exploration upside.

Current resources supporting production expansion

The Tormin tenement area (see Exhibit 2) covers approximately 12km of mineralised beach zone, stretching from Cliff Point in the south to Skaapviel in the north. The area is north of the mouth of the Olifants River and around 30km north of the township of Vredendal.

The average width of the deposit from the cliff to within the surf zone is 123m.

It is developed from surface to a maximum depth of 6.25m with an average resource thickness of 3.5m.

The source of the Tormin beach deposit is eroded paleo strandlines and HM-rich offshore zones. The dynamic tides and wave action in the region transport sediment from deeper waters to the beaches. This process concentrates and upgrades the HMS below the high water mark. This leads to the mineralisation on the beaches being replenished after it has been mined.

Over the last two years, 99% of the beach mined at Tormin has been replenished through normal tidal movements. The replenishment is not uniform. In locations where the replenishment rate is high, some areas have been mined up to 10 times or more.

Resource replenishment is not unique to the Tormin project. It also occurs at other beach placer deposits along the west coast of South Africa and the Tamil Nadu coast located in south-east India.

Exhibit 1: Reconciliation of Tormin mining activity to inferred resources

Mt

THM (%)

Ilmenite (%)

Zircon (%)

Rutile (%)

Garnet (%)

Inferred resource - Dec 2013

2.70

49.4

10.6

3.4

0.7

25.3

Inferred resource - Dec 2014

2.70

38.1

10.1

2.2

0.5

25.2

Inferred resource - Dec 2015

2.70

28.0

7.0

1.6

0.6

18.5

Tonnes mined

- 2014

1.07

53.8

17.3

4.8

0.7

31.2

- 2015

1.62

49.6

16.2

3.9

0.6

28.9

- 2016 Q1 only

0.45

50.9

15.1

3.4

0.6

31.8

- Total

2.69

51.3

16.6

4.2

0.6

29.8

Mined 2014-15 + Dec 2015 inferred resource

5.39

39.6

11.8

2.9

0.6

24.2

Grade premium - mined grade to inferred resource (%)

- mined 2014 grade to Dec 2013 resource

9

63

40

-7

23

- mined 2015 grade to Dec 2014 resource

30

61

76

30

15

- mined 2016 grade (Q1 only) to Dec 2015 resource

82

116

119

16

72

Source: Mineral Commodities, Edison Investment Research

Exhibit 1 illustrates that the inferred resource at Tormin did not change between December 2013 and December 2015 in tonnage terms due to replenishment activity, despite two years of mining. After two years, total material mined plus the inferred resource at December 2015 was 5.39Mt compared with the inferred resource at December 2013 of 2.7Mt prior to mining.

However, grades measured as total heavy mineral (THM), ilmenite, zircon, rutile and garnet dropped in successive years.

Exhibit 2: Tormin mining and prospecting – rights and applications

Source: Mineral Commodities

Achieved mined grades well above inferred resource grades

Although the grade of the inferred resource has been falling, the grades achieved during mining have been at a significant premium to the corresponding grades of the inferred resource for the year prior to mining (see Exhibit 1). This provides confidence for the mining schedule and earnings and cash flow.

For example, mined zircon grades in 2014 and 2015 were 40% and 76% higher than the zircon grades of the December 2013 and December 2014 inferred resources respectively. The premiums have continued with production in Q116, although the very high premiums to the resource grade may not be fully representative because of the smaller sample.

MRC conducts regular grade reconciliation and sample grading as part of the mining operation to correlate between the stated resource and actual resource in terms of quantity, grade and replenishment. At the end of 2015, it also took pit samples from mined areas that had undergone replenishment.

At this stage, it may not be possible to fully account for the poor correlation between the high grades experienced during mining and the lower grades of the inferred resources. In our view, a possible reason is sampling error. However, the positive aspect is that mined grades have maintained a significant premium over inferred resource grades over a period exceeding two years.

According to MRC, the current replenishment dataset is of insufficient size and time frame to allow replenished resources, as in Exhibit 1, to be classified. They are therefore not JORC compliant.

Offshore exploration – objective is a JORC inferred resource

In November, 2015, Mineral Sands Resources Pty (MSR), MRC’s 50%-owned South African subsidiary, was awarded prospecting rights up to 10km offshore from the current mining area, representing an area of 10,500ha (see Exhibit 2). The objective is to investigate the offshore HMS potential that is currently the source of the replenishment of the mineralisation of the beach resource.

Drilling of the surf zone, which is the area between the low tide and the wave crest formation, was due to start in Q216. The programme objective is to achieve an offshore inferred JORC resource.

Coastline exploration – significant potential along 24km target

MSR has also lodged a prospecting and bulk sampling application along the beach and surf zone north of the current mining operations, representing around 24km of coastline and a target area of 398ha (see Exhibit 2). This area has been previously drilled by TSE for diamonds and HMS.

The application is currently under review by the Department of Mineral Resources – South Africa.

Onshore exploration

MSR has also lodged a prospecting application over the recently acquired Geelwal Karoo farm covering an area of 1,741ha (see Exhibit 2). Historical and in-house exploration work has indicated the area to be prospective for HMS deposits.

The application is currently under review by the Department of Mineral Resources – South Africa.

Beach sand mining methods

Mining is by small open pits using coffer-type dams constructed by excavators. The pits are usually only open during low tide except where it is possible to construct larger, more stable protection bunding where beach conditions allow. Extracted material is from surface to bedrock, so there is no stripping ratio.

There is natural replenishment of the pits as they are filled with HMS material from the surf zone during the next high tide. Replenishment is mainly a function of time and the number of sea storm events.

Because of replenishment, it may be possible to re-mine the same mining block. Over the past two years, some mining blocks have been mined up to 10 times or more.

Beach sand processing and heavy mineral sales

The Tormin processing plant is located close to the beach, with ready access to MRC’s mining right area along the 12km of mineralised beach zone.

Saleable products

The Tormin project produces three saleable products:

Non-magnetic mixed zircon rutile concentrate rather than separate zircon and rutile products. MRC is free to market and sell this product to buyers on an unrestricted basis.

ilmenite concentrate: the ilmenite market has been oversupplied and ilmenite produced has been stockpiled. MRC has now reported strong enquiry for its ilmenite, with small sales volumes having commenced in May 2016.

garnet concentrate: MSR stockpiles garnet concentrate, on behalf of the GMA Group (GMA), at the Tormin mine site. The offtake agreement with GMA has recently been amended. The term of the agreement is the life of mine, with an option to take all other remaining concentrate production. The annual offtake tonnage is now 210,000 tonnes, up from 150,000 tonnes. Production in CY15 was 285,000 tonnes.

Benefits of investment in new processing plant

Since the project was commissioned, MRC has progressively invested in new processing plant. The final plant item, the Garnet Stripping Plant (GSP), is planned to be commissioned in early July 2016. The objectives of the investment have included:

higher recovery of the various products from the resource;

better separation of the different products;

achievement of higher product grades (Exhibit 3); and

expansion of output.

Outcomes have included:

lower processing costs per unit of output;

lower transport costs per unit of saleable product for higher-grade concentrates;

higher prices for higher-grade concentrates and maximisation of revenue;

optimisation of the Tormin HM resource, with a significant increase in the recovery of valuable minerals and a reduction in material discarded to tails;

ability to deal with variable feed grade profiles; and

ability to potentially maintain production levels despite a possible decline in feed grades with time.

Exhibit 3: Expected grades for concentrate products before and after the GSP installation

Pre-GSP

Post-GSP

Zircon (%)

72

80

Rutile (%)

12

13

Combined (%)

84

93

Garnet (%)

60

80

Ilmenite (%)

70

70

Source: Mineral Commodities

Processing plant configuration

In broad terms, the two main items of plant are as follows:

Primary Beach Concentrators (PBCs) (2): these concentrators take run of mine (ROM) beach material and process this to a mixed HM concentrate, which incorporates all the recovered minerals together. The concentration is achieved primarily by a gravity method using a spiral circuit.

Secondary Concentrator Plant (SCP): the HM concentrate from the PBCs is processed to saleable products in the SCP. In the SCP, there is a further gravity spiral upgrade before a high-intensity magnetic separation stage, which separates the magnetic and non-magnetic minerals:

non-magnetic minerals: zircon and rutile, which are recovered as a combined concentrate; and

magnetic minerals: ilmenite concentrate and garnet concentrate, both of which are saleable.

Enhancements to the plant after the original commissioning include:

Tailings Scavenger Plants (TSPs) (2): linked to the two PBCs. These recover additional HM material that was previously disposed as waste (tails). The TSP increases HMC recovery from around 66% to 89%, equivalent to an approximate increase in HMC production of 147ktpa at full throughput. Zircon recovery increases from around 84% to 95%.

Garnet Stripping Plant (GSP): this is attached to the front of the SCP and will be commissioned in July 2016. This will remove the garnet fraction from the HMC before the SCP. This will increase the grade of the non-magnetic feed (containing zircon and rutile) to the SCP. During the separation process in the magnetic circuit, there will be an increase in production of zircon/rutile concentrate.

Further plant upgrades are possible in the future, depending on future exploration success and the extent of financial benefit (such as higher-value products) relative to the investment required. These include:

remote primary beach concentrator: production of additional primary concentrate to fully utilise spare capacity in the downstream GSP and SCP;

non-magnetic minerals separation: production of separate zircon and rutile concentrates; and

Ilmenite concentrate upgrade: production of a higher-grade ilmenite concentrate by the removal of contained zircon and garnet (both saleable).

Plant enhancements provide potential spare capacity

Once the GSP is commissioned and all other enhancements fully configured, the processing plant will have additional spare capacity:

TSP capacity can, in effect, act as additional concentrators of ROM feed, in addition to the PBCs; and

the GSP can act as a non-magnetic concentrator to the SCP.

This capacity provides options to lower feed grades by increasing mined tonnes and overall utilisation of the various plant components.

It also provides additional capacity against a possible decline in feed grades such as zircon, as mining progresses. MRC may also consider using a remote primary beach concentrator for mining outside the current mining areas.

Xolobeni project

MRC’s Xolobeni project is located on South Africa’s east coast. It has the potential to be a globally significant asset. It has a measured, indicated and inferred resource of 346Mt at 5% HM containing 9.3Mt ilmenite.

There has been ongoing controversy and resistance to this project. As a result, MRC management is conducting a strategic review of the asset and its development profile. This is being considered relative to the company’s overall business in South Africa.

Valuation

Our base case valuation is A$0.32/share with an upper case of A$0.52/share (Exhibit 4). These valuations are marginally higher than those in our report of 5 February 2016, reflecting a number of small changes to our financial model.

Mine life: our base case valuation is for a four-year life based on existing resources, continued mineral replenishment due to tidal activity and additional offshore, coastal extension and onshore exploration.

Potential additional mine life upside: given the potential of offshore exploration, the 24km of coastal exploration (compared to the existing coastal mining zone of 12km) and onshore exploration, we believe there is potential for a mine life of at least eight years. We use an eight-year mine life in our upper case valuation.

Production expansions: the valuations incorporate production expansions that have been facilitated by the investment in the processing plant, such as the TSP and GSP installations, which have lifted HM recoveries and lifted capacity. These initiatives have also reduced unit costs. Over the period 2015 to 2017, we forecast an increase in the ROM ore treatment rate from 1.6Mtpa to 2.2Mtpa and a corresponding lift in zircon production from 32ktpa to 52ktpa (>60% growth) and rutile production from 6ktpa to almost 9ktpa (just under 50% growth). We also factor in growth of ilmenite concentrate and garnet concentrate sales after a period of stock building.

Prices: our valuations, earnings and cash flow forecasts use long-term zircon and rutile prices of US$1,050 and US$865/t respectively, which are based on price ranges provided by mineral sands consultants TZMI in a recent December 2015 update. These prices are unchanged from the last Edison report December quarter- in transition, uplift in 2016, dated 5 February 2016. In 2016, we use lower zircon and rutile prices at the lower end of TZMI’s range, to reflect recent price weakness. In May, Iluka Resources (ILU.ASX), a major mineral sands producer, reported a recovery in zircon demand and a strengthening of pigment demand and prices. Rutile is one of TiO2 feedstocks used in pigment manufacture.

Payment terms: because MRC sells its zircon and rutile in a mixed concentrate rather than single concentrates, the revenue it receives is discounted for the further processing that needs to be carried out by the purchaser.

Xolobeni: we have reduced the value of the Xolobeni project used in our MRC valuation from a nominal value of US$10m to its book value of US$4.2m to reflect the uncertainty associated with the development of the project.

Exchange rates: we use A$/US$0.72 (spot) vs A$/US$0.70 before.

Exhibit 4: MRC valuation (US$) – base case and upper case

Base case

Upper case

Mine life

4 years

8 years

Tormin (NPV10) (US$m)

86.9

144.3

Xolobeni (book value) (US$m)

4.2

4.2

Net debt/(cash) 31 Mar 2016 (US$m)

(2.8)

(2.8)

Total equity value (US$m)

94.0

151.4

Valuation per share

- US$/share

0.23

0.37

- A$/share

0.32

0.52

No of shares (m)

404.9

A$/US$

0.72

Source: Edison Investment Research

Financials

Major modifications to the Tormin processing plant are expected to be completed in early July 2016. The completion will lift production capacity and product specifications, leading to a substantial boost to revenue, earnings and cash flow. The financial summary is presented in Exhibit 5.

Earnings

MRC reported normalised post-tax earnings of US$10.6m in CY15. We forecast a small improvement to US$10.8m (US$0.027/share) in CY16. The latter is slightly lower than our last CY16 forecast of US$12.2m, mainly due to weaker zircon prices.

Our CY17 earnings forecast of US$28.9m (US$0.071/share) factors in the completion of all the plant improvements, including the GSP, and the associated lift in plant throughput, HM recoveries, higher product grades, higher price realisations and higher absolute output of saleable products. We also assume a recovery of zircon and rutile prices to close to CY15 levels.

From CY18 onwards, we forecast a small decline in earnings to around US$25m pa due to an assumed reduction in mined zircon grades. MRC may be able to mitigate this decline by increasing ore throughput, mining higher-grade material from new areas delineated by exploration or further metallurgical enhancements.

MRC declared a dividend of A$0.01/share in respect of CY15. We forecast an increase to A$0.02/share in CY16 and A$0.064/share in CY17. Projected dividend yields are high. Dividends, payable in Australian dollars, are subject to the prevailing exchange rate with the US dollar.

Cash flow

We see MRC as a very cash-generative business, with future operating cash flow from operations exceeding US$30m from CY17 onwards. This is due to the high grade of its resource, metallurgical enhancements and limited required future capital expenditure.

MRC has a 50% interest in its South African subsidiary MSR under Black Economic Empowerment (BEE) arrangements. However, as MRC effectively has 100% control over the relevant activities for accounting purposes and controls the management and board of MSR, MRC’s financial statements include 100% of the results of MSR. Under the shareholders’ agreement between the shareholders of MSR, the majority of Tormin’s earnings and cash flow over the next four years is attributable to MRC in recognition of capital invested and debt provided. We have allowed for payments to MRC’s BEE partner in the years after the fourth year, as provided for in the shareholders’ agreement. These payments are taken into account in our NPV10 valuation for MRC.

Balance sheet

At 31 March 2016, MRC had cash of US$7.8m. In the absence of new project initiatives and depending on dividend policy, the cash balance may continue to rise with time.

MRC has a loan agreement with GMA for US$4.5m funding to complete the GSP, which was drawn down by US$3.7m as at 31 March 2016. This has a three-year repayment term commencing with the restart of shipping of garnet concentrate product to GMA, planned for January 2017. MRC also had shareholder loans of US$1.3m, repayable in September 2016.

We have allowed for further debt facilities to assist with company growth projects.


Exhibit 5: Financial summary

US$000

2013

2014

2015

2016e

2017e

2018e

2019e

31-December

IFRS

IFRS

IFRS

IFRS

IFRS

IFRS

IFRS

PROFIT & LOSS

Revenue

 

 

225

34,948

46,440

39,373

89,662

86,589

86,589

Cost of sales

(1,382)

(23,878)

(26,368)

(14,485)

(37,552)

(37,552)

(37,552)

Gross profit

(1,157)

11,069

20,072

24,889

52,110

49,037

49,037

General & administration costs

0

(3,426)

(2,412)

(4,400)

(4,600)

(4,600)

(4,600)

EBITDA

 

 

(1,157)

7,644

17,660

20,489

47,510

44,437

44,437

Depreciation

(152)

(3,229)

(4,179)

(4,797)

(6,762)

(6,762)

(6,762)

EBIT (before amort. and except.)

 

 

(1,309)

4,414

13,481

15,692

41,648

36,575

36,575

Intangible amortisation

0

0

0

0

0

0

0

Share based payments

0

0

0

0

0

0

0

Other

(95)

0

0

0

0

0

0

Exceptionals

0

0

(172)

0

0

0

0

EBIT

(1,404)

4,414

13,481

15,692

41,648

36,575

36,575

Net Interest

(166)

(465)

(378)

(307)

(389)

(368)

(122)

Profit before tax (norm)

 

 

(1,570)

3,949

13,104

15,385

41,258

36,207

36,453

Profit before tax (FRS 3)

 

 

(1,570)

3,949

12,931

15,385

41,258

36,207

36,453

Tax

0

4,427

(2,354)

(4,615)

(12,378)

(10,862)

(10,936)

Profit after tax (norm)

(1,570)

8,376

10,749

10,769

28,881

25,345

25,517

Profit after tax (FRS 3)

(1,570)

8,376

10,577

10,769

28,881

25,345

25,517

Minority interest

0

0

0

0

0

0

0

Net income (normalised)

(1,570)

8,376

10,749

10,769

28,881

25,345

25,517

Net income (FRS3)

(1,570)

8,376

10,577

10,769

28,881

25,345

25,517

Average number of shares outstanding (m)

251.8

404.9

404.9

404.9

404.9

404.9

404.9

EPS - normalised (c)

 

 

(0.6)

2.1

2.7

2.7

7.1

6.3

6.3

EPS - normalised fully diluted (c)

 

 

(0.6)

2.0

2.6

2.7

7.1

6.3

6.3

EPS - (IFRS) (c)

 

 

(0.6)

2.1

2.6

2.7

7.1

6.3

6.3

Dividends per share (Australian cents)

0.0

0.0

1.0

2.0

6.4

5.7

5.7

Gross Margin (%)

-514.5

31.7

43.2

63.2

58.1

56.6

56.6

EBITDA Margin (%)

-514.5

21.9

38.0

52.0

53.0

51.3

51.3

Operating Margin (before GW and except.) (%)

-581.8

12.6

29.0

39.9

46.4

42.2

42.2

BALANCE SHEET

Fixed Assets

 

 

30,383

34,986

32,383

37,001

43,623

41,494

39,119

Intangible assets

0

4,037

3,517

3,517

3,517

3,517

3,517

Tangible assets

30,383

30,949

28,865

33,484

40,105

37,976

35,602

Investments

0

0

0

0

0

0

0

Current Assets

 

 

3,548

13,488

8,942

30,336

62,352

66,539

78,836

Stocks

772

5,822

941

9,843

20,691

24,978

24,978

Debtors

1,178

3,085

2,349

10,979

10,346

7,493

7,493

Cash

1,503

4,216

4,227

7,450

29,251

32,005

44,301

Other

94

365

1,424

2,064

2,064

2,064

2,064

Current Liabilities

 

 

(8,548)

(17,191)

(6,376)

(11,175)

(18,323)

(12,081)

(12,081)

Creditors

(2,522)

(9,956)

(3,406)

(5,175)

(12,323)

(6,081)

(6,081)

Short term borrowings

(6,026)

(7,235)

(2,970)

(6,000)

(6,000)

(6,000)

(6,000)

Long Term Liabilities

 

 

0

(77)

(3,272)

(6,783)

(6,783)

(6,783)

(6,783)

Long term borrowings

0

0

(989)

(4,500)

(4,500)

(4,500)

(4,500)

Other long term liabilities

0

(77)

(2,283)

(2,283)

(2,283)

(2,283)

(2,283)

Net Assets

 

 

25,382

31,206

31,676

49,380

80,869

89,169

99,091

CASH FLOW

Operating Cash Flow

 

 

(2,209)

8,440

9,138

4,085

44,444

36,761

44,437

Net Interest

56

(932)

(661)

50

(75)

52

298

Tax

0

0

0

0

0

(10,862)

(10,936)

Capex

(20,517)

(5,414)

(6,071)

(9,500)

(13,500)

(5,000)

(5,000)

Acquisitions/disposals

0

18

0

0

0

0

0

Equity financing

10,492

(3)

0

0

0

0

0

Dividends

0

0

0

(4,495)

(9,067)

(18,198)

(16,502)

Net cash flow

(12,177)

2,108

2,405

(9,860)

21,802

2,753

12,297

Opening net debt/(cash)

 

 

(8,057)

4,523

3,019

(269)

3,051

(18,751)

(21,504)

HP finance leases initiated

0

0

0

0

0

0

0

Other

(403)

(604)

883

6,540

0

0

0

Closing net debt/(cash)

 

 

4,523

3,019

(269)

3,051

(18,751)

(21,504)

(33,801)

Source: Company accounts, Edison Investment Research

Edison, the investment intelligence firm, is the future of investor interaction with corporates. Our team of over 100 analysts and investment professionals work with leading companies, fund managers and investment banks worldwide to support their capital markets activity. We provide services to more than 400 retained corporate and investor clients from our offices in London, New York, Frankfurt, Sydney and Wellington. Edison is authorised and regulated by the Financial Conduct Authority. Edison Investment Research (NZ) Limited (Edison NZ) is the New Zealand subsidiary of Edison. Edison NZ is registered on the New Zealand Financial Service Providers Register (FSP number 247505) and is registered to provide wholesale and/or generic financial adviser services only. Edison Investment Research Inc (Edison US) is the US subsidiary of Edison and is regulated by the Securities and Exchange Commission. Edison Investment Research Limited (Edison Aus) [46085869] is the Australian subsidiary of Edison and is not regulated by the Australian Securities and Investment Commission. Edison Germany is a branch entity of Edison Investment Research Limited [4794244]. www.edisongroup.com

DISCLAIMER
Copyright 2016 Edison Investment Research Limited. All rights reserved. This report has been commissioned by Mineral Commodities and prepared and issued by Edison for publication globally. All information used in the publication of this report has been compiled from publicly available sources that are believed to be reliable, however we do not guarantee the accuracy or completeness of this report. Opinions contained in this report represent those of the research department of Edison at the time of publication. The securities described in the Investment Research may not be eligible for sale in all jurisdictions or to certain categories of investors. This research is issued in Australia by Edison Aus and any access to it, is intended only for "wholesale clients" within the meaning of the Australian Corporations Act. The Investment Research is distributed in the United States by Edison US to major US institutional investors only. Edison US is registered as an investment adviser with the Securities and Exchange Commission. Edison US relies upon the "publishers' exclusion" from the definition of investment adviser under Section 202(a)(11) of the Investment Advisers Act of 1940 and corresponding state securities laws. As such, Edison does not offer or provide personalised advice. We publish information about companies in which we believe our readers may be interested and this information reflects our sincere opinions. The information that we provide or that is derived from our website is not intended to be, and should not be construed in any manner whatsoever as, personalised advice. Also, our website and the information provided by us should not be construed by any subscriber or prospective subscriber as Edison’s solicitation to effect, or attempt to effect, any transaction in a security. The research in this document is intended for New Zealand resident professional financial advisers or brokers (for use in their roles as financial advisers or brokers) and habitual investors who are “wholesale clients” for the purpose of the Financial Advisers Act 2008 (FAA) (as described in sections 5(c) (1)(a), (b) and (c) of the FAA). This is not a solicitation or inducement to buy, sell, subscribe, or underwrite any securities mentioned or in the topic of this document. This document is provided for information purposes only and should not be construed as an offer or solicitation for investment in any securities mentioned or in the topic of this document. A marketing communication under FCA Rules, this document has not been prepared in accordance with the legal requirements designed to promote the independence of investment research and is not subject to any prohibition on dealing ahead of the dissemination of investment research.
Edison has a restrictive policy relating to personal dealing. Edison Group does not conduct any investment business and, accordingly, does not itself hold any positions in the securities mentioned in this report. However, the respective directors, officers, employees and contractors of Edison may have a position in any or related securities mentioned in this report. Edison or its affiliates may perform services or solicit business from any of the companies mentioned in this report. The value of securities mentioned in this report can fall as well as rise and are subject to large and sudden swings. In addition it may be difficult or not possible to buy, sell or obtain accurate information about the value of securities mentioned in this report. Past performance is not necessarily a guide to future performance. Forward-looking information or statements in this report contain information that is based on assumptions, forecasts of future results, estimates of amounts not yet determinable, and therefore involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of their subject matter to be materially different from current expectations. For the purpose of the FAA, the content of this report is of a general nature, is intended as a source of general information only and is not intended to constitute a recommendation or opinion in relation to acquiring or disposing (including refraining from acquiring or disposing) of securities. The distribution of this document is not a “personalised service” and, to the extent that it contains any financial advice, is intended only as a “class service” provided by Edison within the meaning of the FAA (ie without taking into account the particular financial situation or goals of any person). As such, it should not be relied upon in making an investment decision. To the maximum extent permitted by law, Edison, its affiliates and contractors, and their respective directors, officers and employees will not be liable for any loss or damage arising as a result of reliance being placed on any of the information contained in this report and do not guarantee the returns on investments in the products discussed in this publication. FTSE International Limited (“FTSE”) © FTSE 2016. “FTSE®” is a trade mark of the London Stock Exchange Group companies and is used by FTSE International Limited under license. All rights in the FTSE indices and/or FTSE ratings vest in FTSE and/or its licensors. Neither FTSE nor its licensors accept any liability for any errors or omissions in the FTSE indices and/or FTSE ratings or underlying data. No further distribution of FTSE Data is permitted without FTSE’s express written consent.

Frankfurt +49 (0)69 78 8076 960

Schumannstrasse 34b

60325 Frankfurt

Germany

London +44 (0)20 3077 5700

280 High Holborn

London, WC1V 7EE

United Kingdom

New York +1 646 653 7026

245 Park Avenue, 39th Floor

10167, New York

US

Sydney +61 (0)2 9258 1161

Level 25, Aurora Place

88 Phillip St, Sydney

NSW 2000, Australia

Wellington +64 (0)48 948 555

Level 15, 171 Featherston St

Wellington 6011

New Zealand

Frankfurt +49 (0)69 78 8076 960

Schumannstrasse 34b

60325 Frankfurt

Germany

London +44 (0)20 3077 5700

280 High Holborn

London, WC1V 7EE

United Kingdom

New York +1 646 653 7026

245 Park Avenue, 39th Floor

10167, New York

US

Sydney +61 (0)2 9258 1161

Level 25, Aurora Place

88 Phillip St, Sydney

NSW 2000, Australia

Wellington +64 (0)48 948 555

Level 15, 171 Featherston St

Wellington 6011

New Zealand

TxCell — Update 24 June 2016

TxCell

Continue Reading

Subscribe to Edison

Get access to the very latest content matched to your personal investment style.

Sign up for free